https://newsletter.mw.creamermedia.com
  

49 Bisset Road, Jet Park, 1459

  

IPR News

Biggest Sykes pump yet from Integrated Pump Rental

16th November 2021

In another milestone for southern African Sykes distributor Integrated Pump Rental, the company recently delivered its largest unit to date - a Sykes MH300 pump with stainless steel pump end was... 


Unprecedented demand for Grindex stainless steel pumps on Copperbelt

11th October 2021

Integrated Pump Technology reports an unprecedented demand for Grindex stainless steel pumps from customers on the Zambian and DRC Copperbelt. Recent months have seen the company replace cast iron... 


Warning to operators of process dams to desilt as soon as possible

28th September 2021

As the rainy season approaches, Integrated Pump Rental has issued a dire warning to operators of water storage and process dams to make sure that these are desilted as soon as possible and ready to... 


Dewatering needs proactive management

10th September 2021

For surface mining operations, dewatering open pits is a critical component and proactive management should be prioritised to ensure cost effectiveness and maximum efficiencies, says equipment... 


IPR rebuild gives unreliable water pump new life

29th July 2021

When a leading company in the petrochemical sector lost patience with the lack of reliability of a trailer mounted water pump, Integrated Pump Rental delivered a cost effective solution:... 


Rapid dewatering by Sykes high head pump at Botswana Open Pit

8th July 2021

Providing solutions to challenging dewatering applications is what Integrated Pump Rental built its solid reputation on and mines from as far afield as Botswana have called on this dewatering... 


Solutions address challenges from rains

18th June 2021

Heavy rains in recent months have caused the water table to rise, which, in turn, has resulted in “unparalleled issues” for openpit and underground mining operations, with the ingress of water... 


SlurrySucker succeeds where old methods fail

25th March 2021

Integrated Pump Rental’s innovative SlurrySucker desilting barge is successfully cleaning a large process dam for a coal mine in Mpumalanga, after past attempts by numerous contractors had failed.... 


1 2 3 4 5
6
7 8 9

Latest News by Mining Weekly

Lure of Anglo's copper mines could test BHP's spending resolve

20th December 2024

BHP, the world's biggest miner, would need to offer a minimum 40% premium over Anglo American's share price to make a renewed takeover bid now the rival's value has been boosted by asset sales, two... 


Perenti secures A$185m of new work and a contract extension

20th December 2024

Mining services provider Perenti has announced the execution of new contracts and an extension to an existing contract for the company’s subsidiary businesses. These contracts are expected to... 


Rapid Lithium signs term sheet to acquire British Columbia gallium, germanium project

20th December 2024

Australia-listed Rapid Lithium has entered into a binding term sheet to acquire certain mineral claims that comprise the Prophet River gallium/germanium project in British Columbia, Canada, from... 


pqt: 0.753s - ct: 1.748s - 188pq - 2rq
Subscribe Now