https://newsletter.mw.creamermedia.com
  

The Offices of Hyde Park Block B Strouthos Place Hyde Park Sandton 2196 South Africa

  

Trafo Power Solutions News

Trafo Power Solutions: leading provider of tailored power solutions

28th August 2024

Trafo Power Solutions is poised to make a significant impact at this year’s Electra Mining Africa, using the platform to connect with stakeholders and reinforce its leadership in electrical power... 


Minimal maintenance for dry-type transformers

26th August 2024

With minimal levels of maintenance needed, dry-type transformers offer reliable performance over lengthy lifespans, with few of the risks and hazards associated with oil cooled transformers.... 


Specify your transformer with total cost of ownership in mind

18th July 2024

Rather like a vehicle, the total cost of running and maintaining a transformer over its lifespan will be considerably higher than its purchase price; these other cost factors therefore deserve... 


Innovative transformer design for data centre in Nigeria

24th May 2024

The upgrade of a data centre in Nigeria has called for a custom-engineered dry-type transformer solution that can deal with, among other challenges, high level of voltage fluctuations. According to... 


Mini-substations, transformers supplied to DRC

19th April 2024

With its experience in Africa and its agility in executing projects rapidly, electrical equipment supplier Trafo Power Solutions is supplying three mini-substations and two transformers to a... 


Trafo Power Solutions shows it agility in upgrading DRC mine transformers

25th March 2024

With its experience in Africa and its agility in executing projects rapidly, Trafo Power Solutions is supplying three mini-substations and two transformers to a copper-zinc mine in the Democratic... 


Modular substations power in South Africa's data centre boom

27th February 2024

Data centres are experiencing significant growth in South Africa as the digital revolution continues to gain momentum. To keep up with the demand, these facilities must have the flexibility to... 


More dry-type transformers for Bisie from Trafo Power Solutions

27th September 2023

It has been five years since Trafo Power Solutions supplied Alphamin’s Bisie tin mine in the Democratic Republic of Congo with two dry-type transformers; they have performed so well that another... 


1
2
3

Latest News by Mining Weekly

Jubilee lifts chrome, PGM output guidance on strong operational results in South Africa

Updated 10 minutes ago

Aim-listed Jubilee Metals has reported a strong nine months to March 31 for its South African operations, putting the division on track to exceed performance targets for the financial year to end... 


BHP mulls turning Mt Arthur coal mine into pumped hydro asset

Updated 51 minutes ago

Diversified miner BHP has teamed up with renewable energy and infrastructure company ACCIONA Energía to study the feasibility of transforming its Mt Arthur Coal mine in New South Wales into a... 


Mineral Resources tumbles after two governance directors quit

Updated 56 minutes ago

Mineral Resources shares fell more than 7% after two board members overseeing corporate governance resigned. Jacqueline McGill, who joined the board in early 2024, and Susie Corlett, a member... 


pqt: 0.035s - ct: 0.597s - 188pq - 2rq
Subscribe Now