Name of the Project
Amitsoq graphite project.

Location
Southern Greenland.

Project Owner/s
GreenRoc Mining.

Project Description
A preliminary economic assessment has proposed a 400 000 t/y operation with a 22-year life-of-mine (LoM).

The total mined inventory is estimated at 8.26-million tonnes of ore with an average of 21.3% graphite.

The mine plan proposes mining only from the lower graphite layer, leaving considerable resources from the upper graphite layer for future production expansion or extension of the LoM.

The proposed use of a drift-and-fill mining method, coupled with the exceptionally high grades of the Amitsoq ore, will mean that as much as 86% of the tailings will be used as backfill, with only 14% required to go to a tailings storage facility.

Mining will be conducted using a fleet of diesel-powered, electrohydraulic drill jumbos, bolters, load-haul-dump machines and underground fitted trucks.

Potential Job Creation
About 172 jobs will be created.

Net Present Value/Internal Rate of Return
The project has an estimated pretax net present value, at an 8% discount rate, of $235.31-million and an internal rate of return of 31.1%, with a four-year payback from start of production.

Capital Expenditure
About $131-million, including a 25% contingency.

Planned Start/End Date
Not stated.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
GreenRoc Mining, tel +44 20 3950 0724 or email info@greenrocmining.com.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 
VEGA Controls SA (Pty) Ltd
VEGA Controls SA (Pty) Ltd

For over 60 years, VEGA has provided industry-leading products for the measurement of level, density, weight and pressure. As the inventor of the...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (14/03/2025)
14th March 2025 By: Martin Creamer
Magazine round up | 14 March 2025
Magazine round up | 14 March 2025
14th March 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.127 0.26s - 127pq - 2rq
Subscribe Now