Aura seeks compensation from Sweden over uranium ban
Dual-listed Aura Energy is seeking compensation from Sweden for the financial losses that it incurred as a result of the country’s uranium ban that came into effect in August last year.
Aura provided Sweden a written notification under the Energy Charter Treaty (ECT), which is a multilateral legal framework promoting cross-border cooperation in the energy sector, comprising 54 signatories, and which presupposes that signatories respect fundamental legal principles.
“The ECT provides a level playing field of rules to be observed by all participating governments, thereby mitigating risks associated with energy-related investment and trade,” the company said in an announcement on the stock exchange.
A 2012 scoping study for the Häggån uranium project was based on an inferred resource estimate containing 631-million pounds of uranium oxide (U3O8), as well as nickel and molybdenum. The study calculated a production rate of 7.8-million pounds a year of U3O8.
The project had a net present value, at a 10% discount, of $1.85-billion, based on a U3O8 price of $65/lb.
The Häggån project area also hosts Aura’s battery metals project, which has a mineral resource of two-billion tonnes at an average grade of 0.3% vanadium pentoxide, including an indicated 42-million tonnes of ore, at a 0.2% cutoff grade, averaging 0.35% vanadium pentoxide for a contained 320-million pounds referred to as the Northwest high-grade zone.
The main arguments put forward by proponents of the ban concerned the environmental impacts of uranium exploitation and the risk that radioactive pollution posed to human health.
Comments
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation