A scoping study has demonstrated a feasible pathway to developing the US’s largest, measured uranium deposit.
The mining study is based on 107.3-million tonnes at 214 parts per million uranium oxide (U3O8) for 50.6-milllion pounds of U3O8. The study shows that the project has the potential to be developed using industry-standard practices and technologies without any major environmental or social impacts.
It is targeting production of 12-million pounds of U3O8 from measured and indicated mineral resources within the 19.2-million-pound high-grade zone of the total resource, with average production estimated at 1.15-million pounds of U3O8 over an 11-year life-of-mine (LoM). A two-million-tonne-a-year run-of-mine production rate is targeted over the LoM, with a low strip ratio of 2.1:1.
The study has evaluated two options for the back end of the processing plant – contract treatment of loaded resin to produce uranium precipitate or the production of uranium precipitate at the plant site.
A contract resin treatment option has been adopted, owing to the significantly reduced capital requirement for plant construction.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has a pretax net present value, at an 8% discount rate, of $151-million and an internal rate of return of 25.2%, assuming that the project uses contract resin treatment. Payback is estimated at 4.2 years.
Capital Expenditure
$161-million.
Planned Start/End Date
Not stated.
Latest Developments
None stated.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
Aurora Energy Metals, tel +61 8 6465 5500 or email info@auroraenergymetals.com.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation