Boss plans accelerated development at Gould’s Dam
Uranium company Boss Energy has begun work on accelerating the development of Gould’s Dam, which is a satellite project to the nearby Honeymoon mine, in South Australia.
This follows recent high-grade drill results that highlight the potential for Gould’s Dam to help lift Honeymoon’s production rate from 2.45-million pounds a year to the export permit limit of 3.3-million pounds a year.
The current delineation programme provides data that will be used in wellfield planning and other advanced predevelopment activity. It will also enable Boss to complete detailed geological and mineralisation models to support the ongoing development work and preparation for an in-situ recovery mining lease proposal for Gould’s Dam.
This will lead into the next phase of mine plan development, including pump testing of the mineralised aquifer with the Gould’s Dam indicated resource and core sampling testwork.
The Gould’s Dam deposit is located about 80 km north-west of the Honeymoon mine and currently contains a Joint Ore Reserve Commitee- (Jorc-) compliant resource of 4.4-million tonnes at 650 ppm uranium oxide (U308) for 6.3-million pounds contained U308 in the indicated category and 17.7-million tonnes at 480 ppm U308 for 18.7-million pounds contained U308.
The global Honeymoon resource stands at 71.6-million pounds with an average grade of 620 ppm U308, using a cut-off grade of 250 ppm.
The current Honeymoon restart feasibility studies use only a portion of Honeymoon’s Jorc resource, excluding 36-million pounds of Jorc resource outside the Honeymoon Restart Area, which could expand the mine life, and Boss’ defined exploration target could potentially extend the mine life beyond the initial 11 years and increase the production profile. Honeymoon’s Federal EPIP Act approvals allow export of more than three-million pounds a year U308 equivalent.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation