Buena Vista iron project, US


Name of the Project
Buena Vista iron project.
Location
Nevada, US.
Project Owner/s
Magnum Mining.
Project Description
The Buena Vista site is a fully permitted mine, owing to its previous history of production, and is entirely located on private land.
A scoping study completed in August 2023 considers the project as technically low-risk because of the well-studied metrics of the proposed mining and beneficiation operation.
Envisaged is a standalone openpit mine supplying a conventional crush, grind and magnetic separation process, targeting 1.6-million tonnes a year of direct reduction iron magnetite concentrate production over an initial 25-year life-of-mine (LoM). Over the current LoM, 84% of ore will be sourced from indicated resources and 16% from inferred resources. Magnum has advised that the inferred resources are not a determining factor in the project’s viability and that the inferred resources are not required early in the mine plan.
The scoping study considers only the West deposit resource, which, for scheduling purposes, includes the Section 5 resource.
It is proposed that an average of 7.2-million tonnes of ore and 3.6-million tonnes of waste a year will be mined from the West deposit.
The project’s East deposit may be considered to extend the LoM at a later date.
Buena Vista’s magnetite ore will be beneficiated using industry standard methods – primary, secondary and tertiary crushing, followed by coarse wet magnetic separators to reject nonmagnetic portions to waste.
The project includes an office, a laboratory, workshop facilities, stockpiles, waste dumps, a tailings storage facility, water supply borefield and pipe routes, as well as access roads to and within the plant, mine and site.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has an estimated net present value, at a 10% discount rate, of between $360-million and $748-million and an internal rate of return of between 26% and 54%, with an estimated payback of three to five years.
Capital Expenditure
$280-million.
Planned Start/End Date
Not stated.
Latest Developments
Magnum is rapidly progressing with the project. The company expects to embark on a prefeasibility study within a year, followed by a feasibility study. Both studies are expected to take about a year each. Magnum is seeking funding to advance these studies and to secure funding optionality for project development.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
Magnum Mining, tel +61 8 6489 0600 or email info@mmel.com.au.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation