Burnstone gold project, South Africa – update

Name of the Project
Burnstone gold project.
Location
Balfour area, in Mpumalanga, South Africa.
Project Owner/s
Sibanye-Stillwater.
Project Description
The low-cost, extensively predeveloped gold asset was previously operated under Great Basin Gold.
Existing infrastructure includes a functional metallurgical facility; an established tailings storage facility; an equipped and functional decline shaft and trackless decline; surface infrastructure, such as offices, workshops and compressors; and extensive underground development and infrastructure.
The project could potentially contribute 120 000 oz/y of lower cost, long-life production over an estimated 20-year mine life.
Potential Job Creation
Not confirmed.
Net Present Value/Internal Rate of Return
Not confirmed.
Capital Expenditure
Not confirmed.
Planned Start/End Date
Not confirmed.
Latest Developments
The feasibility study and final investment decision are expected in the first half of 2026.
Key Contracts, Suppliers and Consultants
Read, Swatman & Voigt, or RSV (engineering design team for the balance of the engineering design); DLC Town Plan (access surveying and registration of the new servitudes for the new access road to Burnstone); and DTS (appointed for the design change to remove the skips from the shaft using the rock winder bank area).
Contact Details for Project Information
Sibanye-Stillwater executive VP: investor relations James Wellsted, ir@sibanyestillwater.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Comments
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















