Mining rights cadastre contract to be inked next month
The contract for the much-awaited South African mining rights licensing cadastral system is expected to be signed in July, Mineral Resources and Energy deputy director-general of corporate services Hilda Mhlongo told the Portfolio Committee on Mineral Resources and Energy in the National Assembly on May 23.
As part of the tender process for the cadastral system, the State Information Technology Agency (Sita), in collaboration with the DMRE, has been mandated to procure a mining licensing system.
The tender was advertised through the Sita website and closed on May 5. The bid evaluation process began on May 15. Upon its conclusion, this evaluation process will be subjected to an audit process in line with the Sita procurement standard operating plan.
Currently, the Sita supply chain management and DMRE are carrying out a technical mandatory and functionality evaluation of the submissions, along with demonstrations of the proof of concept.
They will shortly look into pricing and black economic empowerment, whereafter a report will be compiled, and authorisation processes within Sita will begin.
The recommendation sign-off date is set for July 5.
Mhlongo cautioned, however, that the audit process could result in delays as this has occurred in the past. However, she reassured committee members that she expected a smooth process.
“We believe the process up to this point has been managed in such a way as to ensure there are no issues. We do not anticipate any issues. We are very optimistic that the process should be able to get us to where we want to get,” she said.
The new cadastral mining licensing system, which will be customised to South Africa’s needs, is expected to enhance efficiency and transparency in the application, granting and management of prospecting and mining rights or permits, thereby increasing the level of mining investment confidence in South Africa.
Through this system, the DMRE has said it seeks to improve the accuracy and accessibility of all relevant information by all stakeholders. Further, the system is expected to empower the DMRE to accelerate the processing of applications within a more reasonable timeframe.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation