Name of the Project
Copperwood project.

Location
Western Upper Peninsula of Michigan, in the US.

Project Owner/s
Highland Copper’s US subsidiary Copperwood Resources.

Project Description
The project envisages an estimated 11-year operation averaging payable copper production of 64.6-million pounds a year and payable silver production of 106 966 oz/y. 

Life-of-mine production is estimated at 300 000 t of copper and 1.1-million ounces of silver.

Room-and-pillar mining methods will be used given the relatively subhorizontal orebody that varies in thickness from 1.6 m to 3.7 m.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has an after-tax internal rate of return of 17.6% with a net present value, at an 8% discount rate, of $222-million before taxes and $168-million after taxes. Payback is estimated at 3.5 years.

Capital Expenditure
Initial capital is estimated at $391-million.

Planned Start/End Date
Commissioning and plant ramp-up will take place during the first quarter of 2026.

Latest Developments
The state of Michigan granted Highland Copper a performance-based grant totalling $50-million for its Copperwood project in April 2024.

The grant, sourced from the Strategic Site Readiness Programme under the Strategic Outreach and Attraction Reserve Fund, aims to facilitate investment-ready sites and bolster economic development.

Funds will be disbursed as performance-based reimbursements, primarily focusing on infrastructure development, including roads, communications infrastructure, and power supply to the site.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Highland Copper, tel +1 450 677 2455 or email info@highlandcopper.com.
 

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Latest Multimedia

 

Showroom

Hanna Instruments (Pty) Ltd
Hanna Instruments (Pty) Ltd

We supply customers with practical affordable solutions for their testing needs. Our products include benchtop, portable, in-line process control...

VISIT SHOWROOM 
Tractor & Grader Supplies
Tractor & Grader Supplies

Tractor & Grader Supplies (TGS™): Your Trusted, Genuine Source for New Replacement Parts for Earthmoving, Construction and Mining Machinery

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Hillside Aluminium smelter in South Africa’s KwaZulu-Natal.
Hillside Aluminium guiding unchanged output for 2025 financial year
17th April 2025 By: Martin Creamer
Andrada CEO Anthony Viljoen.
Andrada looking to opening more mines in Namibia
16th April 2025 By: Martin Creamer
Resources Watch
Resources Watch
16th April 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.112 0.244s - 128pq - 2rq
Subscribe Now