Darwendale platinum group metals project, Zimbabwe – update


Name of the Project
Darwendale platinum group metals (PGMs) project.
Location
Great Dyke, Zimbabwe.
Project Owner/s
JSC Afromet Joint Stock Company, a unit of Russian businessman Vitaly Machitski’s Vi Holdings, and Zimbabwe's Kuvimba Mining House (KMH), each held 50% of Great Dyke Investments (GDI). Afromet exited the GDI joint venture in June 2022, in the wake of Russia’s invasion Ukraine.
Project Description
The Darwendale deposit is a part of the Great Dyke, one of the world’s largest systems of PGMs mineralisation, with shallow-dipping orebodies. The project has a resource of 181-million tonnes of ore containing 17.1-million ounces of PGMs and gold at an average grade of 2.93 g/t.
The project entails the construction of a PGMs mine and processing plant.
Envisaged is the gradual construction of mining, concentrating and smelting facilities, with all related infrastructure, in three stages.
The project will process up to ten-million tons of ore a year to eventually produce up to 855 000 oz/y of PGMs and gold, with Phase 1 of the project expected to produce about 280 000 oz/y of PGMs and gold.
A two-stage expansion plan will later increase production to about 860 000 oz/y of PGMs and gold.
The project has a mine life of about 15 years.
Potential Job Creation
About 1 350 jobs will be created with the development of Phase 1 of the project.
Net Present Value/Internal Rate of Return
Not stated.
Capital Expenditure
Phase 1 – $650-million.
Planned Start/End Date
Not stated.
Latest Developments
The board of directors of Kuvimba Mining House (KMH) announced in June 2022 that KMH had concluded negotiations to buy 50% of the shares in Great Dyke Investments from Afromet.
Key Contracts, Suppliers and Consultants
DRA (bankable feasibility study); Loesche, MSA Group, TOMS Institute and Metallicon (engineering and process design); PwC and SFA Oxford (analytical support); Cresco Project Finance and EY (financial advisers); and FATA, part of Danieli Group (platinum concentrator).
Contact Details for Project Information
GDI, tel +263 242 745659 or email info@greatdykeinvest.com.
Comments
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation