https://newsletter.mw.creamermedia.com
Excavators|PROJECT|Trucks|Drilling
Excavators|PROJECT|Trucks|Drilling
Excavators|project|trucks|drilling

Dumont nickel/cobalt project, Canada – update

18th June 2021

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Dumont nickel/cobalt project.

Location
Dumont is located in the western portion of the Abitibi region, in Quebec, Canada.

Project Owner/s
Nion.

Project Description
Dumont is positioned to be the biggest nickel sulphide operation in the western hemisphere.

The project has mineral reserves of 1.03-million tonnes grading 0.27% nickel, supporting a 30-year mine life.

Dumont will be an openpit mine/mill operation, using conventional drilling and blasting, with loading by a combination of hydraulic excavators and electric rope shovels into trucks. The process plant will be built in two phases.

Phase 1 is expected to produce 33 000 t/y, ramping up to 50 000 t/y in Phase 2.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has an estimated pretax net present value, at an 8% discount rate, of $1.71-billion and an internal rate of return of 19.9%

Capital Expenditure
The project is estimated at $1.02-billion.

Planned Start/End Date
Not stated.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
Ausenco (feasibility study).

Contact Details for Project Information
Nion, tel +1 819 727 3777 or email info@dumontnickel.com.

Edited by Creamer Media Reporter

Comments

 

Showroom

Flameblock
Flameblock

FlameBlock is a proudly South African company that engineers, manufactures and supplies fire intumescent and retardant products to the fire...

VISIT SHOWROOM 
Rittal
Rittal

Rittal is a world leading provider of top-quality integrated systems for enclosures, power distribution, climate control, IT infrastructure and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (14/03/2025)
14th March 2025 By: Martin Creamer
Magazine round up | 14 March 2025
Magazine round up | 14 March 2025
14th March 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.14 0.275s - 128pq - 2rq
Subscribe Now