Excelsior nickel cobalt project, Indonesia
Name of the Project
Excelsior nickel cobalt (ENC) project.
Location
Indonesia.
Project Owner/s
Nickel Industries and Shanghai Decent.
Project Description
The project envisages production at ENC of about 67 000 t/y of contained nickel equivalent.
In addition to producing a mixed hydroxide precipitate, the poject will be capable of producing nickel sulphate and cathode, differentiating it from the current generation of high-pressure acid leach plants being built across Indonesia, and providing Nickel Industries with significant operating flexibility through the cycle.
The project will benefit from existing Indonesia Morowali Industrial Park infrastructure and be supported by existing and future laterite resources that Nickel Industries has identified.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
Not stated.
Capital Expenditure
Shanghai Decent will provide a capital expenditure (capex) guarantee, whereby construction and commissioning costs will not exceed $2.3-billion. The capex guarantee includes a tailings solution, the best of breed for tailings storage and management, and an integrated sulphuric acid plant that will generate significant heat that can be turned into power, significantly lowering the carbon footprint of the operation.
Planned Start/End Date
Construction is expected to start in December 2023, March 2024 or sooner if both parties agree. Commissioning will start no later than 24 months thereafter.
Latest Developments
Nickel Industries and Shanghai Decent are working on a feasibility study for ENC ahead of a final investment decision by Nickel Industries.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
Nickel Industries, tel +61 2 9300 3311 or email info@nickelindustries.com.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation