https://newsletter.mw.creamermedia.com
Contractor|Crushing|Excavator|Exploration|Gold|Mineral Processing|Mining|PROJECT|Resources|Operations
Contractor|Crushing|Excavator|Exploration|Gold|Mineral Processing|Mining|PROJECT|Resources|Operations
contractor|crushing|excavator|exploration|gold|mineral-processing|mining|project|resources|operations

Fair Bride hard-rock gold mining operations, Mozambique – update

Image of gold pour

Photo by Bloomberg

29th July 2022

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Fair Bride hard-rock gold mining operations.

Location
The Fair Bride deposit is situated in the Odzi-Mutare-Manica greenstone belt of Mozambique.

Project Owner/s
Xtract Resources, through its wholly owned Mozambique subsidiary Explorator Limitada.

Project Description
Manica has total proven and probable reserves of 3.21-million tonnes grading 2.62 g/t gold, and total mineral resources of 13.95-million tonnes grading 176 g/t gold.

The Fair Bride deposit, which is the main deposit at Manica, has a 1.262-million-ounce South African Code for the Reporting of Exploration Results, Mineral Resources and Mineral Reserves-compliant gold resource.

Contractor mining with conventional openpit mining methods using truck-and-excavator combinations will be used. The drill-and-blast technique will be used to mine harder material.

The material will be crushed in a three-stage crushing circuit before processing in a ball milling and classification circuit.

The project is expected to produce an estimated 215 293 oz of gold over its seven-year mine life.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a net present value, at an 8.4% discount rate, of $42-million and an internal rate of return of 41.1%, with a payback of two years.

Capital Expenditure
Project value is estimated at $43.68-million.

Planned Start/End Date
Not stated.

Latest Developments
First gold has been poured at the Fair Bride operation. The production was started with the introduction of low-grade ore to commission all parts of the processing circuit.

The company will make a further announcement as and when the plant progresses into regular production.

Key Contracts, Suppliers and Consultants
Sino Minerals Investment (mining contractor agreement for alluvial gold deposits); Omnia Mining and Moz Gold (mining contractor agreement for alluvial deposits) and Mutapa Mining and Processing (independent mineral processing contractor).

Contact Details for Project Information
Xtract Resources, tel +44 20 3416 6471 or email info@xtractresources.com.

Edited by Creamer Media Reporter

Comments

Latest News

An image showing the Kloof gold mine
Sibanye-Stillwater secures six health and safety awards
18th November 2024 By: Tasneem Bulbulia

Showroom

AutoX
AutoX

We are dedicated to business excellence and innovation.

VISIT SHOWROOM 
SABAT
SABAT

From batteries for boats and jet skis, to batteries for cars and quad bikes, SABAT Batteries has positioned itself as the lifestyle battery of...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (15/11/2024)
15th November 2024 By: Martin Creamer
Magazine round up | 15 November 2024
Magazine round up | 15 November 2024
15th November 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.05 0.184s - 128pq - 2rq
Subscribe Now