Hermosa zinc/lead/silver project, US – update
Name of the Project
Hermosa zinc/lead/silver project.
Location
Santa Cruz County, in Arizona, in the US.
Project Owner/s
South32.
Project Description
Hermosa is a polymetallic development comprising the zinc/lead/silver Taylor sulphide deposit, the zinc/manganese/silver Clark oxide deposit and an extensive, highly prospective land package with the potential for further polymetallic and copper mineralisation.
Taylor
A prefeasibility study (PFS) on the Taylor deposit has tipped it to be the first development of a multidecade operation, establishing the project as a globally significant producer of metals critical to a low carbon future. The deposit is being designed as South32’s first ‘next-generation mine’, with automation and technology used to minimise its impact on the environment and target a carbon neutral operation, in line with South32’s goal of achieving net-zero operational carbon emissions by 2050.
The deposit has total mineral resources of 138-million tonnes grading at 3.82% of zinc, 4.25% lead and 81 g/t silver.
The PFS is based on a dual-shaft underground zinc/lead/silver mine development using longhole open stoping and a conventional sulphide ore flotation circuit, producing separate zinc and lead concentrates, with silver by-product credits. The PFS estimates average production of 111 000 t/y of zinc, 138 000 t/y of lead and 7.3-million ounces a year of silver, with the current resource supporting a mine life of 22 years and a nameplate capacity of 4.3-million tonnes.
Clark
The Clark manganese/zinc/silver oxide deposit, located adjacent to and up-dip of the Taylor deposit, has the potential to underpin a second development stage at Hermosa. The has a mineral resource estimate of 55-million tonnes averaging 9.08% manganese, 2.31% zinc and 78% g/t silver. A scoping study has confirmed the potential for a separate, integrated underground mining operation producing battery-grade manganese, as well as zinc and silver.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
Not stated.
Capital Expenditure
$1.23-billion.
Planned Start/End Date
According to the PFS production schedule, first ore is expected in the 2027 financial year, with a single-stage ramp-up to nameplate production expected in the 2030 financial year.
Latest Developments
South32 is progressing plans to potentially produce battery-grade manganese at its Hermosa project, with work on the selection phase of the prefeasibility study (PFS) for its Clark manganese/zinc/silver deposit now complete.
Although the PFS selection study remains subject to an independent review, the company has confirmed the opportunity for the Clark deposit to produce high-purity manganese sulphate monohydrate for the North American electric vehicle supply chain.
South32 (has said that it) has progressed metallurgical testwork at Clark and drilling continues to collect bulk samples for pilot plant production from mid-2023.
The company is also progressing the feasibility study of Hermosa’s Taylor zinc/lead/silver deposit. The study will support a final investment decision, which is expected by mid-2023.
South32 has also continued with the dewatering of Hermosa. The first two out of six dewatering wells have been completed. A second water treatment plant will be commissioned in the June 2023 quarter.
Key Contracts, Suppliers and Consultants
Fluor (process plant and on-site infrastructure); SRK Consulting (geological and technical reviews); Stantec (mining studies); NewFields (hydrogeology studies); Montgomery & Associates (dewatering and tailings); Black and Veatch, and BQE (water treatment design); and CPE (off-site roads).
Contact Details for Project Information
South32, email InvestorRelations@south32.net.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation