High-purity alumina First project, Australia


Name of the Project
High-purity alumina (HPA) First project.
Location
Gladstone State Development Area, in Queensland, Australia.
Project Owner/s
Alpha HPA.
Project Description
The HPA First project will at scale be one of the largest HPA refineries in the world. The 10 ha state-of-the-art facility will leverage the established Stage 1 facility, and the latest in process control systems and automation, making it capable of producing 10 000 t/y of HPA equivalent.
Alpha HPA announced a final investment decision for the second stage of the HPA refinery in May 2024, on the back of a positive definitive feasibility study (DFS). The DFS is based on an annualised HPA product capacity of 10 430 t/y.
Potential Job Creation
Stage 1 is expected to create about 490 jobs during construction and more than 200 jobs upon completion.
Net Present Value/Internal Rate of Return
The payback period from first production for Stage 2 is estimated at 3.7 years.
Capital Expenditure
Stage 1 has a preproduction capital cost of A$308.13-million.
Stage 2 will cost A$553-million.
Planned Start/End Date
The project is expected to start construction in 2024 and will be operational in 2025. Construction of Stage 2 is expected to start in mid-2024, with first production scheduled for the first half of the 2027 financial year.
Latest Developments
None stated.
Key Contracts, Suppliers and Consultants
Prudentia Process Consulting (DFS and cost estimation); Prudentia and HPAlumina (pilot plant, engineering); and Aecom (permitting approvals).
Contact Details for Project Information
Alpha HPA, tel +61 2 9300 3310 or email info@collerinacobalt.com.au.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation