Name and Location
High-purity alumina (HPA) production plant, Quebec, Canada.

Client
Orbite Aluminae.

Project Description
The project involves the conversion of an HPA pilot plant into a state-of-the-art full-scale one-ton-a-day HPA facility, although the facility is expected to reach 3 t/d of HPA within 12 months of its commissioning without requiring further significant capital expenditure.

Value
Not stated.

Duration
The plant is expected to begin production in the first quarter of 2015.

Latest Developments
The first phase of building at Orbite’s 3 t/d HPA facility at Cap-Chat, in Quebec, has been completed, placing the $105-million project on schedule to start commercial production in the first quarter of 2015.

The completed phase comprised work to structurally reinforce the HPA building for the subsequent installation of the Outotec calcination equipment.

Fabrication of the calcination equipment at Outotec’s Burlington, Ontario facilities is complete and installation at site is slated to start in the week of September 8, following curing of the new foundation to support the equipment. The mechanical contract for this installation has been awarded to CNC Mechanical.

Management expects installation of the decomposition and calcination reactors to take up to six weeks, in line with Orbite’s construction schedule, and will be followed by refractory installation and curing. The refractory installation contract is currently under negotiation.

Key Contracts and Suppliers
Gastier (general contractor), Canam Group (design and construction of new building), Outotec (HPA calcination work) and Emerson Process Management (process control instrumentation).

On Budget and on Time?
Overall, work on the HPA facility continues on schedule for commercial production in the first quarter of 2015.

Contact Details for Project Information
Orbite Aluminae, tel +1 514 744 6264 or fax +1 514 744 193.
Gastier, tel +1 514 325 4220.
Outotec, tel +358 20 529 211 or fax +358 20 529 2200.

Edited by Creamer Media Reporter

Comments

Latest Multimedia

 

Showroom

Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 
Essentra Components
Essentra Components

We are responsible manufacturers of essential components. Manufacturing 80 million parts a week, we have over 1 billion parts in stock.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Hillside Aluminium smelter in South Africa’s KwaZulu-Natal.
Hillside Aluminium guiding unchanged output for 2025 financial year
17th April 2025 By: Martin Creamer
Andrada CEO Anthony Viljoen.
Andrada looking to opening more mines in Namibia
16th April 2025 By: Martin Creamer
Resources Watch
Resources Watch
16th April 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.105 0.245s - 128pq - 2rq
Subscribe Now