Honeymoon uranium mine, Australia – update
Name of the Project
Honeymoon uranium mine.
Location
South Australia, about 80 km north-west of Broken Hill, near the border with New South Wales.
Project Owner/s
Boss Energy.
Project Description
The project will produce 2.45-million pounds of uranium a year over an initial 12-year mine life.
Uranium produced over the life-of-mine is estimated at 20.74-million pounds of uranium.
In situ recovery has been chosen as the preferred method of mining.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
Not stated.
Capital Expenditure
$69.68-million.
Planned Start/End Date
Construction and development activities are proceeding on schedule to deliver first production in the fourth quarter 2023.
Latest Developments
Boss Energy is set to produce its first drum of uranium from the Honeymoon project in the current quarter.
This comes as the company started commissioning the first ion-exchange (IX) circuit within the processing plant.
The IX circuit will drive efficiencies at Honeymoon, increasing throughput to a nameplate capacity of 2.45-million pounds a year, while reducing ramp-up time and technical risks.
The IX milestone follows the continuous operation of the wellfields, water treatment plant, reverse osmosis system and required agents.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
Boss Energy, tel +61 8 6263 4494 or email boss@bossenergy.com.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation