https://newsletter.mw.creamermedia.com
Construction|Energy|Mining|PROJECT|System|Water
Construction|Energy|Mining|PROJECT|System|Water
construction|energy|mining|project|system|water

Honeymoon uranium mine, Australia – update

Periodic table symbol for uranium

8th March 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Honeymoon uranium mine.

Location
South Australia, about 80 km north-west of Broken Hill, near the border with New South Wales.

Project Owner/s
Boss Energy.

Project Description
The project will produce 2.45-million pounds of uranium a year over an initial 12-year mine life.

Uranium produced over the life-of-mine is estimated at 20.74-million pounds of uranium.

In situ recovery has been chosen as the preferred method of mining.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
$69.68-million.

Planned Start/End Date
Construction and development activities are proceeding on schedule to deliver first production in the fourth quarter 2023.

Latest Developments
Boss Energy is set to produce its first drum of uranium from the Honeymoon project in the current quarter.

This comes as the company started commissioning the first ion-exchange (IX) circuit within the processing plant.

The IX circuit will drive efficiencies at Honeymoon, increasing throughput to a nameplate capacity of 2.45-million pounds a year, while reducing ramp-up time and technical risks.

The IX milestone follows the continuous operation of the wellfields, water treatment plant, reverse osmosis system and required agents.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Boss Energy, tel +61 8 6263 4494 or email boss@bossenergy.com.

Edited by Creamer Media Reporter

Comments

Latest Multimedia

 

Showroom

Rittal
Rittal

Rittal is a world leading provider of top-quality integrated systems for enclosures, power distribution, climate control, IT infrastructure and...

VISIT SHOWROOM 
Alco-Safe
Alco-Safe

Developed to exceed the latest EN 15964 standards for police breathalysers proving that it will remain accurate and reliable for many years to come.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Hillside Aluminium smelter in South Africa’s KwaZulu-Natal.
Hillside Aluminium guiding unchanged output for 2025 financial year
17th April 2025 By: Martin Creamer
Andrada CEO Anthony Viljoen.
Andrada looking to opening more mines in Namibia
16th April 2025 By: Martin Creamer
Resources Watch
Resources Watch
16th April 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.131 0.263s - 127pq - 2rq
Subscribe Now