Kalgoorlie rare earths processing plant, Australia – update

Image – piles of rare earths

6th August 2021

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Kalgoorlie rare earths processing plant.

Location
Kalgoorlie, in Western Australia.

Project Owner/s
Lynas Corporation.

Project Description
The project will take rare-earth concentrate produced at the Mt Weld operation, in Western Australia, and produce a mixed rare-earth carbonate, which will be exported to the Lynas Malaysia plant for solvent extraction, and to the company’s planned commercial light rare earth separation plant, in the US.

The project will treat about 162 000 t/y of Mt Weld concentrate, producing 86 000 t/y of rare-earth carbonate product.

The value-added processing to be undertaken in Kalgoorlie is aligned with the Australian government’s Critical Minerals Strategy and the objective of the Western Australian government to increase downstream processing and the development of intellectual property in the state.

Potential Job Creation
The plant is expected to create up to 290 positions during construction, including the direct workforce on the project.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
$500-million.

Planned Start/End Date
The Kalgoorlie plant is expected to be operational in early 2023.

Latest Developments
Lynas Rare Earths is optimistic that it will receive environmental protection authority (EPA) approval for its Kalgoorlie rare earths processing facility before the end of 2021, enabling it to meet its mid-2023 production target.

Speaking at the Diggers & Dealers conference, in Kalgoorlie, on August 2, Lynas VP for upstream operations Kam Leung said the company had incorporated lessons learned from its Malaysian plant into the design of the Kalgoorlie operations.

Key Contracts, Suppliers and Consultants
Metso Outotec (kiln) and Polaris Engineering Services (tank fabrication).

Contact Details for Project Information
Lynas Corporation, tel +60 9 582 5200.

Edited by Creamer Media Reporter

Comments

 

Showroom

RioCarb
Rio-Carb

Introducing the Rio-Carb Smart Chute Concept - a revolutionary advancement in materials handling, designed for the toughest industries like mining...

VISIT SHOWROOM 
VEGA Controls SA (Pty) Ltd
VEGA Controls SA (Pty) Ltd

For over 60 years, VEGA has provided industry-leading products for the measurement of level, density, weight and pressure. As the inventor of the...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (14/03/2025)
14th March 2025 By: Martin Creamer
Magazine round up | 14 March 2025
Magazine round up | 14 March 2025
14th March 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.105 0.474s - 129pq - 2rq
Subscribe Now