Lac à Paul purified phosphoric acid plant, Canada – update


Photo by ©Bloomberg
Name of the Project
Lac à Paul purified phosphoric acid (PPA) plant.
Location
The Saguenay-Lac-Saint-Jean region, located in Quebec, Canada.
Project Owner/s
Arianne Phosphate.
Project Description
The project includes the construction and operation of a downstream PPA plant.
The facility will convert regionally produced phosphate concentrate into PPA. Two proposed grades of phosphoric acid will be produced at the facility – a very high-purity PPA known as “white acid”, used in the production of lithium-iron-phosphate batteries and direct food additives, and a Tier 2 phosphoric acid, used in the production of specialty fertilisers and animal feeds.
The facility aims to produce 350 000 t/y of high-purity PPA and 220 000 t/y of the Tier 2 phosphoric acid, making it a substantial Western producer of battery- and food-grade PPA.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has a pretax net present value, at an 8% discount rate, of $4.51-billion and an internal rate of return of 32.8%, with a payback of 3.03 years.
Capital Expenditure
The full downstream operation is projected to have an initial capital expenditure of about $1.65-billion.
This covers the logistics for a phosphate concentrate transportation system on the south shore of the Saguenay river, an on-site sulphur plant for the production of sulphuric acid, and a merchant-grade acid and purified phosphoric acid plant.
Planned Start/End Date
Not stated.
Latest Developments
Arianne Phosphate has received C$3.8-million in financing through an unsecured convertible debenture from an unnamed strategic investor.
The proceeds received will be used to advance the company's work on the Lac à Paul project, specifically on the downstream facility.
Under the terms of the investment, the strategic investor has acquired a convertible debenture in the principal amount of C$3.8-million that matures in three years and bears interest at 9.5% a year. Interest payments are added to the principal amount of the convertible debenture; consequently, no amounts are required to be repaid by Arianne until the maturity of the instrument.
The investor has the option to convert the principal amount of the convertible debenture at C$0.35 a share, and the accrued interest thereon at a price per share equal to the greater of C$0.35 and the market price at the time of the conversion of the accrued interest.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
Arianne Phosphate, tel +1 418 549 7316, fax +1 418 549 5750 or email info@arianne-inc.com.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation