https://newsletter.mw.creamermedia.com
Construction|Crushing|Excavators|Gold|Mining|PROJECT|Road|Roads|Trucks|Waste|Equipment|Waste
Construction|Crushing|Excavators|Gold|Mining|PROJECT|Road|Roads|Trucks|Waste|Equipment|Waste
construction|crushing|Excavators|gold|mining|project|road|roads|trucks|waste-company|equipment|waste

Lafigué gold project, Côte d’Ivoire

Cross section of Lafigué South drill results

Cross section of Lafigué South drill results

Photo by Endeavour Mining

20th January 2023

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Lafigué gold project.

Location
On the Fetekro property, in Côte d’Ivoire.

Project Owner/s
Endeavour Mining.

Project Description
Lafigué has proven and probable reserves of 49.8-million tonnes grading 1.69 g/t gold.

The Lafigué deposit is amenable to conventional openpit, drill-and-blast mining, which will be undertaken by contractors.

The openpit will be developed in six stages, with a maximum mining capacity of 55-million tonnes a year.

The mine will produce an average of 203 000 oz/y at an over a 12.8-year mine life.

Ore mining will occur in three to four flitches, selectively using smaller loading equipment to decrease dilution.

Diesel excavators and trucks will be used for loading and haulage, with a fleet comprising 400 t class face shovels to load 180-t-capacity dump trucks for waste mining, and 200 t class excavators to load 180-t-capacity dump trucks for ore mining. Ore will be processed through a four-million-tonne-a-year processing plant, based on only a fresh ore feed. The operation will involve two-stage crushing followed by a high-pressure grinding roll and ball milling circuit.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 5% discount rate, of $664-million and an internal rate of return 25% at a $1 500/oz gold price, with a payback of 3.9 years.

Capital Expenditure
The project has an upfront capital cost of $448-million.

Planned Start/End Date
First production is expected early in the third quarter of 2024.

Latest Developments
Site roads to the mine from the national road network, the 24 km mine perimeter fence, the mine’s airstrip and the earthworks for the construction camp have been completed as part of the early works.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Endeavour Mining, tel +44 203 011 2723 or email info@endeavourmining.com.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

Weir
Weir

Weir is a global leader in mining technology. We recognise that our planet’s future depends on the transition to renewable energy, and that...

VISIT SHOWROOM 
Avlock International
Avlock International

Avlock International is a leading manufacturer and distributor of Specialized Fastening Systems.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Martin Creamer talks about safety, ruthenium and a new palladium centre plan.
On-The-Air (18/04/2025)
19th April 2025 By: Martin Creamer
Magazine round up | 18 April 2025
Magazine round up | 18 April 2025
18th April 2025
Hillside Aluminium smelter in South Africa’s KwaZulu-Natal.
Hillside Aluminium guiding unchanged output for 2025 financial year
17th April 2025 By: Martin Creamer

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.21 0.341s - 129pq - 2rq
Subscribe Now