https://newsletter.mw.creamermedia.com
Concrete|Construction|Gold|PROJECT|Operations
Concrete|Construction|Gold|PROJECT|Operations
concrete|construction|gold|project|operations

Lion One's Fiji project on track

29th June 2023

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – First production from the Tuvatu alkaline gold project, in Fiji, is still on track for the fourth quarter of this year, triple-listed Lion One Metals said on Thursday.

The ASX- and TSX-V-listed company noted that mine construction was 75% complete and remained on track. Earthworks and concrete works were also 70% complete, with over 3 500 m3 of concrete poured to date.

Once complete, Lion One plans to operate the processing plant at an initial production capacity of 300 t/d for the first 18 months of operations before increasing the capacity to 500 t/d in mid-2025.

A 2020 preliminary economic assessment indicated that the project would have a mine life of five years producing 331 369 oz of gold at a yearly rate of 77 969 oz/y.

The company is fully funded to complete mine construction and bring the Tuvatu alkaline gold project into production by the end of the year.

Edited by Creamer Media Reporter

Comments

 

Showroom

Weir
Weir

Weir is a global leader in mining technology. We recognise that our planet’s future depends on the transition to renewable energy, and that...

VISIT SHOWROOM 
Rittal
Rittal

Rittal is a world leading provider of top-quality integrated systems for enclosures, power distribution, climate control, IT infrastructure and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Minerals Council South Africa CEO Mzila Mthenjane
Minerals Council optimistic about ongoing MPRDA review
13th December 2024 By: Marleny Arnoldi
Magazine round up | 13 December 2024
Magazine round up | 13 December 2024
13th December 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.12 0.197s - 127pq - 2rq
Subscribe Now