https://newsletter.mw.creamermedia.com
Design|Engineering|Fabrication|PROJECT|Resources|Equipment|Operations
Design|Engineering|Fabrication|PROJECT|Resources|Equipment|Operations
design|engineering|fabrication|project|resources|equipment|operations

Liontown progresses Kathleen Valley development

10th January 2022

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Lithium developer Liontown Resources is progressing the development of its Kathleen Valley project, in Western Australia, awarding a key contract to processing equipment supplier Metso-Outotec for the design, fabrication and delivery of a semi autogenous grinding (SAG) mill.

The SAG mill contract is worth an estimated A$10-million, and the mill will accommodate both base production of 2.5-million tonnes a year and the planned expansion to 4-million tonnes a year in year six of the mine plan.

Liontown said on Monday that detailed engineering and design for the A$473-million Kathleen Valley project continues and the company is targeting the award of all key equipment packages over the next six months to maintain schedule and meet its target of first production of lithium concentrate in 2024.

The Stage 1, 2.5-million-tonne-year operation will produce about 500 000 t/y of spodumene concentrate. During year six of the operation, a further A$66-million investment will be made to increase the project capacity to 4-million tonnes a year, delivering 700 000 t/y of spodumene concentrate.

Based on this production scenario, the Kathleen Valley operations is expected to have a mine life of 23 years, and will generate life-of-mine free cash flows of A$12.2-billion. The DFS estimated a post-tax net present value of A$4.2-billion and an internal rate of return of 57%, with a payback period of 2.3 years.

“The SAG mill contract is the first of the long-lead items to be ordered and represents an important milestone for the Kathleen Valley project. Placing this significant order with a world-class partner in Metso-Outotec is a great way to start the year and reflects our commitment to advance the Kathleen Valley project rapidly towards first production,” said Liontown MD and CEO Tony Ottaviano.

Edited by Creamer Media Reporter

Comments

 

Showroom

John Ratcliffe
John Ratcliffe

At John Ratcliffe, we are aftermarket specialists for heavy-duty on and off-road vehicles. We engineer and retrofit advanced safety systems, engine...

VISIT SHOWROOM 
Tractor & Grader Supplies
Tractor & Grader Supplies

Tractor & Grader Supplies (TGS™): Your Trusted, Genuine Source for New Replacement Parts for Earthmoving, Construction and Mining Machinery

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (14/03/2025)
14th March 2025 By: Martin Creamer
Magazine round up | 14 March 2025
Magazine round up | 14 March 2025
14th March 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.102 0.175s - 128pq - 2rq
Subscribe Now