Manna lithium project, Australia – update
Photo by Global Lithium
Name of the Project
Manna lithium project.
Location
Goldfields region of Western Australia.
Project Owner/s
Global Lithium Resources (GL1).
Project Description
A scoping study has confirmed the potential for a globally competitive lithium project.
The scoping study envisages an operation with a life-of-mine of ten years, with an estimated total production of 2.2-million tonnes of spodumene concentrate, based on mineral resources of 32.7-million tonnes at 1% lithium.
The concentrator will have a nameplate capacity of two-million tonnes a year of run-of-mine ore.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has an estimated pretax net present value, at an 8% discount rate, of A$2.8-billion and an internal rate of return of 103%, with a payback of 15 months after first production.
Capital Expenditure
Direct capital costs are estimated at A$299.4-million.
Planned Start/End Date
A final investment decision on the spodumene concentrate operation at Manna is expected in mid-2024, with construction likely to take 22 months, and first spodumene concentrate targeted for production in 2026.
Latest Developments
Global Lithium has reported that it will implement corporate and operational changes owing to a likely protracted downturn in the global lithium market.
The company has said that it will immediately pause works pertaining to its feasibility study at the Manna project and materially reduce its monthly expenditure on all corporate overheads and operational spending to maintain financial stability.
The lithium miner has said that it will also reduce its board size from four to three members until there is greater certainty in lithium market forecasts.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
Global Lithium Resources, email info@globallithium.com.au
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation