Manna lithium project, Australia – update

Location map of the Manna lithium project

Photo by Global Lithium

13th September 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Manna lithium project.

Location
Goldfields region of Western Australia.

Project Owner/s
Global Lithium Resources (GL1).

Project Description
A scoping study has confirmed the potential for a globally competitive lithium project.

The scoping study envisages an operation with a life-of-mine of ten years, with an estimated total production of 2.2-million tonnes of spodumene concentrate, based on mineral resources of 32.7-million tonnes at 1% lithium.

The concentrator will have a nameplate capacity of two-million tonnes a year of run-of-mine ore.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has an estimated pretax net present value, at an 8% discount rate, of A$2.8-billion and an internal rate of return of 103%, with a payback of 15 months after first production.

Capital Expenditure
Direct capital costs are estimated at A$299.4-million.

Planned Start/End Date
A final investment decision on the spodumene concentrate operation at Manna is expected in mid-2024, with construction likely to take 22 months, and first spodumene concentrate targeted for production in 2026.

Latest Developments
Global Lithium has reported that it will implement corporate and operational changes owing to a likely protracted downturn in the global lithium market. 

The company has said that it will immediately pause works pertaining to its feasibility study at the Manna project and materially reduce its monthly expenditure on all corporate overheads and operational spending to maintain financial stability.

The lithium miner has said that it will also reduce its board size from four to three members until there is greater certainty in lithium market forecasts.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Global Lithium Resources, email info@globallithium.com.au

Edited by Creamer Media Reporter

Comments

 

Showroom

John Ratcliffe
John Ratcliffe

At John Ratcliffe, we are aftermarket specialists for heavy-duty on and off-road vehicles. We engineer and retrofit advanced safety systems, engine...

VISIT SHOWROOM 
Weir
Weir

Weir is a global leader in mining technology. We recognise that our planet’s future depends on the transition to renewable energy, and that...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Minerals Council South Africa CEO Mzila Mthenjane
Minerals Council optimistic about ongoing MPRDA review
13th December 2024 By: Marleny Arnoldi
Magazine round up | 13 December 2024
Magazine round up | 13 December 2024
13th December 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.134 0.267s - 127pq - 2rq
Subscribe Now