McPhillamys gold project, Australia


Photo by ©Bloomberg
Name of the Project
McPhillamys gold project.
Location
Kings Plains, about 8 km from Blayney, in New South Wales, Australia.
Project Owner/s
Regis Resources, through its subsidiary LFB Resources.
Project Description
The project aims to develop a seven-million-tonne-a-year operation.
The project includes three-stage crushing, including high-pressure grinding rolls; a 6.9 MW ball mill; whole ore of leach at 45 µm with two 3.4 MW vertical mills; conventional carbon-in-leach tanks and associated equipment; a tailings storage facility (Stage 1); a 90 km water supply pipeline and all associated infrastructure encompassing power, offices and workshops.
Potential Job Creation
The project will create about 480 jobs during the initial 12- to 18-month construction period for the mine site, and another 260 jobs once the mine is operating. Construction of the proposed water pipeline will provide another 120 jobs.
Net Present Value/Internal Rate of Return
Not stated.
Capital Expenditure
Regis reported in April 2024 that the previously indicated development costs will be higher than previously anticipated and communicated. Preproduction capital is now estimated at between $115-million and $155-million, with total construction costs estimated at between $845-million and $900-million.
Planned Start/End Date
Construction is expected to take two years to complete.
Latest Developments
Finalisation of preproduction costs is still in progress.
Regis’s project team along with technical specialists continue to review opportunities to optimise the project’s key capital items and explore alternative development and operational efficiencies. Regis now expects the definitive feasibility study to be completed by the end of the 2024 financial year.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
Regis Resources, tel +61 8 9442 2200 or email enquiries@regisresources.com.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation