https://newsletter.mw.creamermedia.com
Construction|Consulting|Design|Excavators|Mining|PROJECT|Services|Trucks
Construction|Consulting|Design|Excavators|Mining|PROJECT|Services|Trucks
construction|consulting-company|design|Excavators|mining|project|services|trucks

Moblan lithium project, Canada

Location map of the Moblan project

Photo by Sayona

5th April 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Moblan lithium project.

Location
Eeyou Istchee James Bay territory in north-western Québec, Canada.

Project Owner/s
Sayona (60%) and Investissement Québec (40%).

Project Description
A definitive feasibility study (DFS) has demonstrated a financially and technically viable operation, based on an estimated Joint Ore Reserves Committee-compliant probable ore reserve of 34.5-million tonnes at 1.36% lithium oxide.

The mill is designed to process 1.8-million tonnes a year to produce 300 000 t/y of spodumene concentrate over a 21.1-year life-of-mine.

Openpit mining methods comprising a conventional fleet of excavators and trucks will be used. The final design comprises two pits, with the Moleon pit encompassing the Moleon domain, and the Main pit encompassing the Main, Inter and South domains.

The process plant will have a feed rate f 4 800 t/d, with an average life-of-mine recovery of 74.7% spodumene concentrate grading at 6% lithium oxide.

Net Present Value/Internal Rate of Return
The DFS estimates a pretax net present value, at an 8% discount rate, of C$3.9-billion and an internal rate of return of 47.4%, with an after-tax payback of 2.3 years.

Potential Job Creation
Not stated.

Capital Expenditure
$962-million.

Planned Start/End Date
Construction is expected to take two years to complete.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
InnovExplo Inc, in collaboration with AtkinsRéalis (formerly SNC-Lavalin), Primero Group Americas, SLR Consulting, G Mining Services Inc and Richelieu Hydrogéologie Inc (DFS).

Contact Details for Project Information
Sayona Mining, tel +61 7 3369 7058 or email info@sayonamining.com.
 

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Latest Multimedia

Latest News

Magazine round up | 18 April 2025
Magazine round up | 18 April 2025
18th April 2025

Showroom

WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 
ESAB showroom image
ESAB South Africa

ESAB South Arica, the leading supplier of high-end welding and cutting products to the Southern African industrial market is based in...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Hillside Aluminium smelter in South Africa’s KwaZulu-Natal.
Hillside Aluminium guiding unchanged output for 2025 financial year
17th April 2025 By: Martin Creamer
Andrada CEO Anthony Viljoen.
Andrada looking to opening more mines in Namibia
16th April 2025 By: Martin Creamer
Resources Watch
Resources Watch
16th April 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.049 0.182s - 127pq - 2rq
Subscribe Now