https://newsletter.mw.creamermedia.com
Consulting|Copper|Design|Engineering|flotation|Gold|Mining|PROJECT|srk|SRK Consulting|Waste|Water|Environmental|Drilling|Waste
Consulting|Copper|Design|Engineering|flotation|Gold|Mining|PROJECT|srk|SRK Consulting|Waste|Water|Environmental|Drilling|Waste
consulting-company|copper|design|engineering|flotation|gold|mining|project|srk|srk-consulting|waste-company|water|environmental|drilling|waste

Arctic copper/zinc/lead/silver/gold project, US – update

Image of US map/flag

21st January 2022

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Arctic copper/zinc/lead/silver/gold project.

Location
The Ambler mining district of north-western Alaska, in the US.

Project Owner/s
Ambler Metals, a joint venture between Trilogy Metals and South32.

Project Description
A feasibility study has described the technical and economic viability of establishing a conventional openpit copper/zinc/lead/silver/gold mine and mill complex for a 10 000 t/d operation for a minimum 12-year life-of-mine (LoM).

The feasibility study forecasts an average yearly payable production to be more than 155-million pounds of copper, 192-million pounds of zinc, 32-million pounds of lead, 32 165 oz of gold and 3.4-million ounces of silver.

Over the operation’s LoM, production is forecast at 1.9-billion pounds of copper, 2.3-billion pounds of zinc, 388-million pounds of lead, 386 000 oz of gold and 40.6-million ounces of silver.

The feasibility study is based on an openpit mining operation, with a conventional milling and flotation process that results in the production of copper, zinc and lead concentrates.

Based on the feasibility level metallurgical work on the sulphide mineralisation, the average recoveries are projected to be 89.9% for copper, 90.6% for zinc and 79.0% for lead in their respective concentrates. More than 60% of the recovered payable silver and gold report to the lead concentrate at 95% payable. The LoM strip ratio is estimated at 6.9:1.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a pretax net present value, at an 8% discount rate, of $1.6-billion and an internal rate of return of 31% for the base case, with a payback of 2.4 years.

Capital Expenditure
The project will require an initial capital expenditure of $905.6-million.

Planned Start/End Date
Not stated.

Latest Developments
Ambler Metals has reported that it will soon start the formal permitting process for the Arctic project.

An independent consulting company has completed a preparedness review of the draft permitting package for the project and, with some minor changes, the application will be submitted to the US Army Corps of Engineers (USACE) in the first quarter of 2022.

As the project is located on state and private land, the key federal permit will be the 404 Dredge, or Fill, Permit that is issued by the USACE, the lead agency during the federal permitting process.

In parallel with the federal permitting process, the state of Alaska will have to issue several permits and there will also be other permits issued by the Northwest Arctic Borough, with the overall permitting process expected to take 24 to 30 months to be completed.

Trilogy and South32 have also approved a 2022 budget of $28.5-million for Ambler.

The 2022 budget for Ambler will cover up to 10 000 m of helicopter-supported diamond drilling that is expected to start in early June. The meterage will be divided between resource development drilling at Arctic and scout drilling of both volcanogenic massive sulphide targets in the Ambler belt, with a focus on targets near Arctic, and carbonate-hosted copper targets around Bornite and the Cosmos Hills.

Key Contracts, Suppliers and Consultants
Ausenco Engineering Canada Inc (independent consultants – feasibility study); Wood Canada (mine planning); SRK Consulting (tailings and waste design, hydrology and water management studies); BD Resource Consulting and SIM Geological (mineral resource estimates); International Metallurgical & Environmental Inc (metallurgy and recoveries); and Integrated Sustainability Consultants (selenium water treatment plant design).

Contact Details for Project Information
Trilogy Metals, tel +1 604 638 8088 or email info@trilogymetals.com.
South32,tel +61 8 9324 9000.

Edited by Creamer Media Reporter

Comments

 

Showroom

Alcohol Breathalysers
Alcohol Breathalysers

Supplier & Distributor of the Widest Range of Accurate & Easy-to-Use Alcohol Breathalysers

VISIT SHOWROOM 
RioCarb
Rio-Carb

Introducing the Rio-Carb Smart Chute Concept - a revolutionary advancement in materials handling, designed for the toughest industries like mining...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Minerals Council South Africa CEO Mzila Mthenjane
Minerals Council optimistic about ongoing MPRDA review
13th December 2024 By: Marleny Arnoldi
Magazine round up | 13 December 2024
Magazine round up | 13 December 2024
13th December 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.127 0.265s - 129pq - 2rq
Subscribe Now