https://newsletter.mw.creamermedia.com
Modular|PROJECT|Projects
Modular|PROJECT|Projects
modular|project|projects

New Talisman secures processing plant

18th June 2024

By: Creamer Media Reporter

     

Font size: - +

ASX- and NZX-listed New Talisman Goldmines has agreed terms to purchase a processing plant for the Talisman mine project, in New Zealand.  

The plant, which uses modular gravity separation, has a 100 t/d capacity, which will be sufficient for the near-term production forecast of the mine, the company said in a statement.

The purchase is conditional on New Talisman conducting a successful capital raise and upon a physical inspection of the plant.

New Talisman recently applied for the inclusion of the project in New Zeland’s Fast Track Approvals Bill, which aims to streamline the approvals process for significant projects.

The Talisman mine has progressed to a state of readiness to begin production. The company previously accused the Department of Conservation of being “extremely slow” in progressing its long-term access arrangement and associated authority to enter and operate.

Edited by Creamer Media Reporter

Comments

Latest Multimedia

Latest News

Magazine round up | 18 April 2025
Magazine round up | 18 April 2025
18th April 2025

Showroom

Goodwin Submersible Pumps Africa (Pty) Ltd
Goodwin Submersible Pumps Africa (Pty) Ltd

Goodwin Submersible Pumps Africa is sole distributors for Goodwin electrically driven, submersible, abrasion resistance slurry pumps.

VISIT SHOWROOM 
Flameblock
Flameblock

FlameBlock is a proudly South African company that engineers, manufactures and supplies fire intumescent and retardant products to the fire...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Hillside Aluminium smelter in South Africa’s KwaZulu-Natal.
Hillside Aluminium guiding unchanged output for 2025 financial year
17th April 2025 By: Martin Creamer
Andrada CEO Anthony Viljoen.
Andrada looking to opening more mines in Namibia
16th April 2025 By: Martin Creamer
Resources Watch
Resources Watch
16th April 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.145 0.219s - 126pq - 2rq
Subscribe Now