Nickel Shäw nickel/copper/cobalt/platinum group metals project, Canada


Name of the Project
Nickel Shäw nickel/copper/cobalt/platinum group metals project.
Location
Yukon, Canada.
Project Owner/s
Nickel Creek Platinum Corp.
Project Description
A prefeasibility study (PFS) on the project has proven positive.
The project comprises Nickel Creeks’ core nickel/copper/cobalt/platinum group metals (PGMs) Wellgreen deposit, as well as the Arch, Burwash, Formula, Musk and Quill claims.
The PFS proposes an openpit mine using conventional openpit mining methods, with a life-of-mine (LoM) of more than 19 years.
Average LoM concentrates production is expected to be 103 100 t/y of bulk nickel/copper/cobalt/PGMs, 95 000 t/y of nickel concentrate and 19 600 t/y of copper concentrate.
Total LoM payable metal production includes: 614.3-million pounds of nickel, 281.5-million pounds of copper, 21.5-million pounds of cobalt, 626 500 troy ounces of platinum, 743 400 troy ounces of palladium and 174 400 troy ounces of gold. The tailings will be stored in a tailings storage facility adjacent to the concentrator.
Concentrate would be transported by truck 480 km to the Port of Skagway ore terminal.
Power will be primarily sourced from a liquified natural gas power plant.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has a net present value, at a 5% discount rate, of $547-million and an internal rate of return of 7.7%, with an after-tax payback of 12.7 years.
Capital Expenditure
Initial costs are estimated at $1.69-billion.
Planned Start/End Date
The project will take about three to four years to complete.
Latest Developments
None stated.
Key Contracts, Suppliers and Consultants
AGP Consultants Inc (PFS).
Contact Details for Project Information
Nickel Creek Platinum Corp, tel +1416304 9315 or email info@nickelcp.com.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation