https://newsletter.mw.creamermedia.com
Installation|Mining|PROJECT|Resources|transport|Waste|Waste|Operations
Installation|Mining|PROJECT|Resources|transport|Waste|Waste|Operations
installation|mining|project|resources|transport|waste-company|waste|operations

Premier to raise £2.48m for its Zulu project

15th February 2024

By: Tasneem Bulbulia

Senior Contributing Editor Online

     

Font size: - +

Aim-listed Premier African Minerals intends to raise £2.48-million before expenses through a subscription to advance its Zulu lithium and tantalum project.

“This placement assures Zulu of plant startup, subject only to suppliers meeting their obligations and undertakings. This has and remains Premier's single most important objective at this stage. That is targeted for next week and remains on target at this time.

“Early indications are that subsequent working capital finance will be available from commercial lenders at Zulu when production is under way as Zulu must begin to fund its operations without the assistance of Premier once commercial production has commenced,” says CEO George Roach.

Funds now raised will be used specifically for direct operating expenses at Zulu, including final payments related to the thickener purchase and installation; final payments related to the ball mill and associated hydrosizers, transport and installation thereof; plant operating spares and reagents; mining costs; and day-to-day operating expenses including diesel.

As announced last month, Premier elected to make a significant expansion in the mining operations to facilitate delivery of ore with less waste to mitigate any residual issues with the sorters (which continue to be optimised) when plant production restarts at Zulu.

While the mill has now been delivered and installed at Zulu, there was a delay with the delivery which further constrained Premier’s cash resources.

Premier says it continues to engage with Zimbabwe-based lenders for working capital facilities at Zulu – these potential lenders need to see production from Zulu, and while Premier strongly believes that Zulu will be able to source a working capital facility, this is now largely dependent on Zulu being in production.

Based on the above, Premier says it believes that securing funding through the above subscription is the best immediate solution to securing further project funding to see Zulu start production in late February.

Once production has begun, Premier posits it should see one or more of the alternatives to equity-based funding materialise.

On this basis, Premier’s current expectation is that it is now fully funded to first production at Zulu. 

Edited by Chanel de Bruyn
Creamer Media Senior Deputy Editor Online

Comments

Showroom

M and J Mining
M and J Mining

M and J Mining are leading suppliers of physical support systems as used by the underground mining industry. Our selection of products are not...

VISIT SHOWROOM 
Aqs image
AQS Liquid Transfer

AxFlow AQS Liquid Transfer (Pty) Ltd is an Importer and Distributor of Pumps in Southern Africa

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (15/11/2024)
15th November 2024 By: Martin Creamer
Magazine round up | 15 November 2024
Magazine round up | 15 November 2024
15th November 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.46 0.54s - 128pq - 2rq
Subscribe Now