Project Description
A definitive feasibility study (DFS), completed in April 2020, has placed Rhyolite Ridge as the single-most attractive project for the production of lithium carbonate, lithium hydroxide and boric acid globally.
The lithium and boron mineral resource is estimated at 146.5-million metric tonnes, including an ore reserve of 60-million metric tonnes, an increase in the reserve from the previous estimate of 280% over the 26-year life-of-mine (LoM).
The mine plan comprises almost entirely reserve material, with nearly 50% of that being proven ore reserves.
The resource remains open in three directions, allowing for a potential extension to the LoM.
The project will mine 2.5-million metric tons a year of ore over the LoM to produce about 20 600 t/y of lithium carbonate, or about 22 000 t/y of lithium hydroxide and 174 400 t/y of boric acid, on average.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has an after-tax net present value, at an 8% real discount rate, of $1.265-billion and an unlevered internal rate of return of 20.8%, with a payback of 5.2 years from the start of first production.
Capital Expenditure
The DFS estimates that the total capital expenditure to complete the project will be $785-million, including an 8% contingency.
This represents an increase of $186-million from the PFS.
Planned Start/End Date
The project schedule has a total duration of 41 months from the start of the engineering, procurement and construction management phase to final completion, with first product shipment expected in the second quarter of 2023.
Latest Developments
The Financial Surveillance Department of the South African Reserve Bank (SARB) has approved a $490-million deal between ioneer and Sibanye-Stillwater.
In September, the two companies struck a A$490-million deal, under which Sibanye-Stillwater will acquire a 50% interest in ioneer’s Rhyolite Ridge lithium/boron mining project.
ioneer has also agreed to provide Sibanye-Stillwater with an option to participate in 50% of the North basin, upon Sibanye-Stillwater’s election to contribute an additional $50-million.
Sibanye-Stillwater also agreed to a strategic placement of $70-million of ioneer’s shares at the developer’s ten-day volume-weighted average price as at September 15. The proceeds from the placement would be used to meet development capital requirements and medium-term working capital needs, as well as to buy long-lead items to minimise time to production.
The SARB approval was a condition of the joint venture transaction and the Sibanye-Stillwater placement. The remaining conditions include receipt of the necessary permits and binding debt-funding commitments, which are expected to be satisfied by the second half of 2022.
Key Contracts, Suppliers and Consultants
Fluor (DFS).
Contact Details for Project Information
ioneer, tel +61 2 9922 5800.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation