https://newsletter.mw.creamermedia.com
Copper|Financial|Infrastructure|PROJECT|Proximity|Environmental|Infrastructure
Copper|Financial|Infrastructure|PROJECT|Proximity|Environmental|Infrastructure
copper|financial|infrastructure|project|proximity|environmental|infrastructure

Saints nickel project, Australia

Image of long section of Saint's nickel mineral resource estimates

Photo by Future Battery Metals

30th June 2023

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Saints nickel project.

Location
Norseman-Wiluna greenstone belt, Western Australia.

Project Owner/s
Future Battery Minerals.

Project Description
A scoping study has demonstrated potentially strong financial metrics for the project.

The scoping study is based on a 911 000 t resource grading 2.3% nickel, 0.17% copper and 0.07% cobalt, which equates to 20 995 contained nickel, 1 570 t contained copper and 631 t contained cobalt.

Simple infrastructure and mine development requirements support a simple toll treatment operation in proximity of several third-party concentrators operating i n the Lei nster- Kalgoorlie-Kambalda region.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a net present value, at an 8% discount rate, of A$55.7-million or an internal rate of return of 362%, with payback estimated at about 12 months.

Capital Expenditure
Capital expenditure, including sustaining capital, is estimated at a$10.68-million.

Planned Start/End Date
Not stated.

Latest Developments
Baseline environmental studies are well advanced to facilitate the permitting process for potential development. Future Battery Minerals expects to start a follow-up prefeasibility study to realise an economic return from its flagship project.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Future Battery Minerals, tel +61 8 6383 7817 or email info@futurebatteryminerals.com.au.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Latest Multimedia

 

Showroom

Flameblock
Flameblock

FlameBlock is a proudly South African company that engineers, manufactures and supplies fire intumescent and retardant products to the fire...

VISIT SHOWROOM 
Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Hillside Aluminium smelter in South Africa’s KwaZulu-Natal.
Hillside Aluminium guiding unchanged output for 2025 financial year
17th April 2025 By: Martin Creamer
Andrada CEO Anthony Viljoen.
Andrada looking to opening more mines in Namibia
16th April 2025 By: Martin Creamer
Resources Watch
Resources Watch
16th April 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.166 0.367s - 129pq - 2rq
Subscribe Now