https://newsletter.mw.creamermedia.com
Excavator|Excavators|Gold|Mining|PROJECT|Resources|Trucks|Equipment
Excavator|Excavators|Gold|Mining|PROJECT|Resources|Trucks|Equipment
excavator|Excavators|gold|mining|project|resources|trucks|equipment

Tick Hill gold project, Australia

29th May 2020

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Tick Hill gold project.

Location
The project is located in Queensland, Australia.

Project Owner/s
Carnaby Resources.

Project Description
Tick Hill has total indicated and inferred resources estimated at 837 000 t grading 2.47 g/t gold.

A scoping study has proposed the development of a mining and toll treatment operation.

Scheduled processing of the 348 000 t mined ore, at a grade of 2.47 g/t, is planned to occur over a 12-month period to recover about 25 211 oz
of gold.

Mining of the openpit cutback and the tailings dam stockpile will be completed by contract mining. Contract mining equipment required to complete the material movement, including excavators, dump trucks and loaders will be provided and operated by the mining contractors on a bank cubic metre rate. The openpit cutback will require drill-and-blast.

The tailings dam stockpile is free dig and requires only excavation using a front-end loader or excavator.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
The capital cost of the project is estimated at $295 000, including a $39 000 contingency.

Planned Start/End Date
Site establishment is expected to take three months.

Latest Developments
The results of the scoping study have demonstrated compelling economics warranting the immediate advance to prefeasibility studies.

Ongoing discussions are in progress with third parties for toll treatment options and contract miners regarding a potential joint venture arrangement.

Key Contracts and Suppliers
None stated.

Contact Details for Project Information
Carnaby Resources, tel +61 8 9320 2320.

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

 

Showroom

Multotec
Multotec

Multotec, recognised industry leaders in metallurgy and process engineering help mining houses across the world process minerals more efficiently,...

VISIT SHOWROOM 
Willard
Willard

Rooted in the hearts of South Africans, combining technology and a quest for perfection to bring you a battery of peerless standing. Willard...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (14/03/2025)
14th March 2025 By: Martin Creamer
Magazine round up | 14 March 2025
Magazine round up | 14 March 2025
14th March 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.119 2.121s - 128pq - 2rq
Subscribe Now