Twin Hills gold project, Namibia


Name of the Project
Twin Hills gold project.
Location
Namibia.
Project Owner/s
Osino Resources Corp.
Project Description
A prefeasibility study (PFS), based on 2.15-million ounces in reserves, has outlined a 13-year mine life with an average production of 169 000 oz/y of gold in the first ten years of operation.
Life-of-mine (LoM) gold production is estimated at 1.98-million ounces.
The project is planned as a multipit mining operation, with seven pushbacks in the Central Twin Hills/Bulge pit design and three separate satellite pits (Clouds, Clouds West and Twin Hills West) to be mined in different phases throughout the LoM.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 5% discount rate, of $783-million and an internal rate of return of 33%, with a payback of 2.2 years.
Capital Expenditure
The initial capital cost of the project is estimated at $375-million.
Planned Start/End Date
Not stated.
Latest Developments
Osino has initiated engineering studies aimed at optimising the process flowsheet and reflecting potentially significant capital cost savings identified while completing the prefeasibility study.
Osino intends to complete and publish a definitive feasibility study on the Twin Hills project during the second quarter of 2023.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
Osino Resources, tel +264 61 246 533.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation