https://newsletter.mw.creamermedia.com
Exploration|Fire|Infrastructure|Power|Surface|Systems|Underground|Maintenance|Infrastructure|Operations
Exploration|Fire|Infrastructure|Power|Surface|Systems|Underground|Maintenance|Infrastructure|Operations
exploration|fire|infrastructure|power|surface|systems|underground|maintenance|infrastructure|operations

Wesdome suspends Kiena work on forest fire smoke risk

The Kiena Complex

The Kiena Complex

9th June 2023

By: Mariaan Webb

Creamer Media Senior Deputy Editor Online

     

Font size: - +

Underground activities and surface exploration work at the Kiena mine, in Val d’Or, have been temporarily suspended, owing to the forest fires that are burning in Quebec.

Chairperson and interim CEO Warwick Morley-Jepson said on Thursday that although there were no fires within at least a 50 km radius at Kiena, the wind direction had changed and the plumes of smoke generated by the fires pose a potential threat to the well-being of staff on site.

“A proactive decision has been made to temporarily suspend underground operations, which will be evaluated on a shift-by-shift basis,” he reported.

Morley-Jepson noted that some essential surface activities, such as operation of the mill, shaft maintenance and the placement of paste fill underground, could continue safely and that production was not expected to be materially affected.

No infrastructure or power supply systems at either of Wesdome’s operations have been affected.

The Eagle mine, in Ontario, is running as normal with the closest fire more than 100 km away and there is no threat of smoke in the area at this time.

Edited by Creamer Media Reporter

Comments

Latest Multimedia

 

Showroom

Flameblock
Flameblock

FlameBlock is a proudly South African company that engineers, manufactures and supplies fire intumescent and retardant products to the fire...

VISIT SHOWROOM 
Actom
Actom

Your one-stop global energy-solution partner

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Hillside Aluminium smelter in South Africa’s KwaZulu-Natal.
Hillside Aluminium guiding unchanged output for 2025 financial year
17th April 2025 By: Martin Creamer
Andrada CEO Anthony Viljoen.
Andrada looking to opening more mines in Namibia
16th April 2025 By: Martin Creamer
Resources Watch
Resources Watch
16th April 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.1 0.176s - 129pq - 2rq
Subscribe Now