Wonarah direct shipping ore project, Australia


Name of the Project
Wonarah direct shipping ore (DSO) project.
Location
Barkly Tableland of the Northern Territory of Australia.
Project Owner/s
Avenira.
Project Description
A DSO feasibility study completed in October 2023 has demonstrated the strong economics of the project and shown a low technical risk. The project has mineral resources estimated at 66-million tonnes at 30.2% phosphorous pentoxide at a 27% cutoff grade.
The DSO study focuses on the development, extraction and sale of mineral resources from the Arruwurra phosphate mineral body at Wonarah over a 23-month period.
The project will mine readily saleable phosphate rock from an openpit across the Arruwurra phosphate rock deposit at Wonarah. Mineralised domains comprise a main mudstone phosphorite unit with a basal indurated high phosphate (BPH) grade unit. The location of the openpit is designed to reflect the area of the deposit containing the highest amount of material fit for DSO production.
The study envisages a simple openpit mining and crushing operation, with a process flowsheet that does not require wet beneficiating. It aims to produce 836 000 t of saleable phosphate product over the life-of-mine. The mine will produce BPH lumps, which are well suited to the production of yellow phosphorus, BPH fines and direct application phosphate rock.
The mine will use mining contractors to optimise capital efficiency.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has a short payback period of 14 months.
Capital Expenditure
A$11.5-million.
Planned Start/End Date
Not stated.
Latest Developments
None stated.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
Avenira, tel +61 8 9264 7000 or email frontdesk@avenira.com.
Comments
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation