Woodlark gold project, Papua New Guinea
Photo by ©Bloomberg
Name of the Project
Woodlark gold project.
Location
Woodlark Island (Muyua Island), in Papua New Guinea.
Project Owner/s
Geopacific Resources.
Project Description
A July 2024 scoping study has proposed total gold production of 1.14-million ounces over a 12.1-year mine-life from low-strip openpit mining of more than 97% measured and indicated mineral resources.
Average gold production of about 95 000 oz/y will be delivered by a 2.9-million-tonne-a-year conventional carbon-in-leach processing facility at an average 90.1% gold recovery.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
Based on a A$2 900/oz gold price, the project has a pretax net present value, at an 8% discount rate, of A$625-million and an internal rate of return of 40.5%. Payback is estimated at 18 months from first production.
Capital Expenditure
Preproduction capital is estimated at A$326-million for mine development, gold plant and infrastructure engineering, procurement and construction management costs, first fills and critical spares.
Planned Start/End Date
Not stated.
Latest Developments
Exploration is being progressed to target extensions to known, high-grade, near-surface mineralisation with substantial resource growth potential.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
Geopacific Resources, tel +61 8 6143 1820 or email info@geopacific.com.au.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation