Woxna graphite anode project, Sweden


Name of the Project
Woxna graphite anode project.
Location
Near the town of Edsbyn, in Ovanåker municipality, Gävleborg County, in Sweden.
Project Owner/s
Leading Edge Materials.
Project Description
The preliminary economic assessment (PEA) has indicated the potential viability of a Swedish operation producing battery-grade graphite anode material using an existing graphite mine and concentrator at the Kringel deposits, with the addition of a value-add processing facility off site.
Conventional openpit drill-and-blast, combined with truck-and-shovel mining methods, have been selected to be operated by a local specialist mining contractor to maximise the operational efficiency, provide flexibility and potentially lower investment risk to the project. The existing processing plant at the project’s Kringel deposit and mine location are planned to be used to produce a graphite concentrate product.
The PEA includes capital expenditure for minor upgrades of the plant to improve the quality of the concentrate produced. The existing rod mill comminution circuit should be complemented with a new crushing plant, crushed material stockpile and rod mill classifier.
The material will be beneficiated in a proven flotation circuit, which will be further upgraded with additional flotation cells, vertical mills, dewatering cyclones and clarifiers to improve on the carbon grade of the final graphite concentrate product.
Life-of-mine (LoM) average plant feed is estimated at 159 967 t/y, coated spherical purified graphite at 7 435 t/y and micronised graphite product at 8 421 t/y.
The project has a LoM of 15 years.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The project has a pretax net present value of $317-million, at an 8% discount rate, and an internal rate of return 42.9%, with a payback of 2.24 years from first production.
Capital Expenditure
Initial capital expenditure is estimated at $121-million.
Planned Start/End Date
Not stated.
Latest Developments
None stated.
Key Contracts, Suppliers and Consultants
Zenito (PEA) and Minviro (life-cycle assessment).
Contact Details for Project Information
Leading Edge Materials, email info@leadingedgematerials.com.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation