https://newsletter.mw.creamermedia.com
Aluminium|Construction|PROJECT|Service
Aluminium|Construction|PROJECT|Service
aluminium|construction|project|service

Alpha advances HPA circuit construction

12th October 2023

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – ASX-listed Alpha HPA is on track to fully commission the high purity alumina (HPA) circuit at its Stage 1 precursor production facility (PPF), in Queensland.

The company said on Thursday that it was in the final stages of deploying the A$15.5-million grant funding awarded under the Critical Minerals Development Programme to install a small-scale commercial HPA circuit at the Stage 1 project.

The HPA circuit will expand the PPF production capacity for aluminium nitrate and aluminium sulphate, and will produce up to 15 t/y of additional HPA production capacity, between 15 t/y to 25 t/y of HPA trihydrate capacity, up to an additional 10 t/y of high purity boehmite capacity, nano HPA production to service end-users in the semi-conductor sector, and the production of HPA tablets for synthetic sapphire glass growth.

The Queensland government recently announced that it would provide up to A$30-million in funding to Alpha HPA to turn locally-produced alumina into glass for smart watches and phones.

The investment will accelerate the delivery of two purpose-built furnaces used to ‘grow’ sapphire glass at Alpha HPA in Gladstone. The units will enable Alpha HPA to produce more than 4 t of sapphire glass from HPA each year.

Ahead of the commissioning of the new HPA circuit, the Stage 1 PPF is producing 4N purity alpha phase and gamma phase HPA at small scale to support the Brisbane facility in supplying sales and product test orders.

The Stage 1 PPF is also supplying aluminium nitrate to the Brisbane facility to service end-user test orders for high purity boehmites, HPA trihydrate, and high purity nano-aluminas.

Edited by Creamer Media Reporter

Comments

Showroom

Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 
John Thompson
John Thompson

John Thompson, the leader in energy and environmental solutions through value engineering and innovation, provides the following: design, engineer,...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (15/11/2024)
15th November 2024 By: Martin Creamer
Magazine round up | 15 November 2024
Magazine round up | 15 November 2024
15th November 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.066 0.142s - 129pq - 2rq
Subscribe Now