Aim-listed critical raw materials producer Andrada Mining reported a 15% year-on-year increase in contained tin production to 232 t for the third quarter of the 2025 financial year, ended November 30.
The company processed 239 240 t of ore during the quarter, up 5% from the 228 234 t processed in the third quarter of the 2024 financial year. Improvements in plant performance were key contributors to this growth, with a tin recovery rate increasing by 12% year-on-year to 74% and plant use rising to 93%, up from 86% in the same period the year before.
The company also achieved a 26% year-on-year increase in the realised tin price, which averaged $31 266/t during the quarter.
Tantalum production remained stable, with about 16 t of saleable concentrate produced at a grade of 10.9% tantalum pentoxide (Ta₂O₅).
FINANCIAL OVERVIEW
Operating costs during the third quarter slightly exceeded guidance, with the average C1 cash cost reaching $22 008/t of contained tin and the all-in sustaining cost (AISC) at $30 779/t.
This was owing to increased processing and maintenance expenses as part of engineering improvements at the Uis mine, in Namibia. Despite this, year-to-date costs for the nine months ended November 30 remained within guidance, with C1 costs at $19 727/t and AISC at $28 575/t.
Andrada’s available cash, as of November 30, stood at £2.6-million, or $3.3-million, reflecting one-off value-added tax (VAT) payments for imported equipment and ongoing expansion projects.
The company anticipates a refund for most of the VAT paid and expects a $1.5-million payment from SQM Lithium upon regulatory approval of the Lithium Ridge agreement.
Andrada CEO Anthony Viljoen, meanwhile, highlighted the company’s achievements in operational efficiency and production growth, noting that the continuous improvement programme has been pivotal in delivering these results.
“We remain strategically focused on improving operational efficiencies, expanding tin concentrate production, and reducing operational costs,” Viljoen stated.
He also expressed optimism about global tin and lithium markets, which appear poised for further price increases due to constrained supply.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation