AngloGold Ashanti to start US production by 2025
KALGOORLIE (miningweekly.com) – Gold miner AngloGold Ashanti is targeting first gold from its North Bullfrog gold mine, in Nevada, by the end of 2025.
The miner’s chief development officer, Terry Briggs, said on the sidelines of the Diggers & Dealers conference that the feasibility study for the North Bullfrog project was due for completion before the end of this year.
While first gold from the heap leach circuit is targeted for the end of 2025, the project would ramp up to an ultimate steady-state production of 100 000 oz/y by 2026, with Briggs telling Mining Weekly Online that the project would have a mine life of around ten years.
The permitting process and the environmental baseline studies for North Bullfrog are continuing, and AngloGold Ashanti is expecting permitting to be in place shortly.
“North Bullfrog is a small satellite deposit. The real prize is the expanded Silicone project. We already have four-million ounces defined at the Silicone deposit and have released an exploration target of six- to eight-million ounces at Merlin, so that is a minimum ten-million ounces,” Briggs said.
A conceptual study on the expanded Silicone study is currently under way.
Meanwhile, AngloGold Ashanti is days away from a shareholder vote on the company’s plans to move its primary listing to the NYSE and to re-domicile from South Africa to the UK. The company in June ceased share trading on the ASX.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation