Battery anode facility, United Arab Emirates

Name of the Project
Battery anode facility (BAF).
Location
Abu Dhabi, United Arab Emirates.
Project Owner/s
Battery metals developer NextSource Materials.
Project Description
NextSource announced positive results of a technical and economic study on the construction of a proposed 30 000 t/y BAF in September 2025.
The proposed operation will have a production capacity, comprising 10 000 t/y of purified flake graphite (PFG), 16 000 t/y of spherical purified graphite (SPG) and 4 000 t/y of coated SPG.
This accommodates the expected growth of Mitsubishi Chemical’s existing offtake agreement volume requirements beyond the initial 9 000 t/y and the expectation that the company will secure additional volume capacities with other original-equipment manufacturers’ offtakes.
The facility will be developed in two phases, with the initial phase targeting production capacity of 14 000 t/y of active anode material comprising 10 000 t/y of PFG and 4 000 t/y of SPG.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The proposed project has an after-tax net present value, at an 8% discount rate, of $441.8-million and an internal rate of return of 24.2%.
Capital Expenditure
$290.9-million.
Planned Start/End Date
Initial production is planned for the fourth quarter of 2026, with full production expected in early 2028.
Latest Developments
None stated.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
NextSource Materials, tel +1 416 364 4911 or email investors@nextsourcematerials.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















