Beyondie sulphate of potash project expansion, Australia – update


Name of the Project
Beyondie sulphate of potash project (BSoPP).
Location
Western Australia.
Project Owner/s
Kalium Lakes Limited (KLL).
Project Description
The front-end engineering and design (FEED) for Beyondie has delivered even further improved production and financial outcomes, including:
• a 10% increase in the production rate, from 82 000 t/y of sulphate of potash (SoP) in the September 2018 bankable feasibility study (BFS) to an estimated 90 000 t/y Stage 1 SoP facility, ramping up to a 180 000 t/y full-scale facility (BFS 164 000 t/y) proposed in the FEED;
• an overall system potassium recovery improvement, from 72% to 91%, as a result of debottlenecking the process plant and an increase in the potassium recovery from the flotation tails stream; and
• a decrease in the total evaporation pond size, from 445 ha to 399 ha.
The initial mine life is estimated at more than 30 years and up to 50 years.
The SoP product quality has remained the same, at a premium from 51% to 52% potassium oxide, with negligible chloride and minimal insoluble material.
Potential Job Creation
The Beyondie project will create up to 80 jobs during construction and employ about 50 full-time workers over the 30-year life of the mine. It will also result in important infrastructure being added to the regional community, with the construction of an airstrip, upgraded roads, improved communications and a 78 km gas pipeline.
Net Present Value/Internal Rate of Return
The project’s pretax net present value has increased from A$575-million, at an 8% discount rate in the BFS, to A$606-million in the FEED, while the internal rate of return of has decreased from 20.4% 20.3%.
The September 2018 BFS estimated an initial payback of seven years.
Capital Expenditure
Preproduction capital for Stage 1 has increased from A$159.6-million in the definitive feasibility study (DFS) to A$216-million in the FEED.
Planned Start/End Date
The project was approved in October 2019. Commissioning and ramp-up to nameplate throughput is expected in 2020.
Latest Developments
Kalium Lakes has produced its first SoP at the Beyondie project.
The SoP was delivered during the commissioning process, with scheduled commercial production ramp-up remaining on track.
Key Contracts and Suppliers
KLL (DFS), K-UTEC AG Salt Technologies (K-UTEC) and Ebner (engineering, procurement and supervision); K-UTEC, DRA Global, Advisian, Shawmac, Wyntak and Preston Consulting (principal technical consultants and FEED); RSM, DLA Piper Australia, HopgoodGanim Lawyers and BurnVoir Corporate Finance (accounting, legal, commercial and financial advisers); Edgen Murray (manufacture and supply of the coated line pipe), Pipecraft (pipeline installation); and Primero (design, supply and construction of the inlet and delivery stations, as well as the pipeline).
Contact Details for Project Information
KLL, tel +61 8 9240 3200 or email info@kaliumlakes.com.au.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation