Name of the Project
Browns Range heavy earths project.

Location
East Kimberley region of Western Australia.

Project Owner/s
Northern Minerals.

Project Description
A definitive feasibility study (DFS) has outlined the project’s technical and financial viability and its strategic significance as a near-development source of dysprosium and terbium (Dy/Tb).

The project mine plan includes openpit mining transitioning to underground mining, with production predominantly through end-on longitudinal sublevel caving. 

The project is expected to include 12 years of mining, supporting an 11-year life-of-mine, defined as the period from first to final concentrate production.

Two production scenarios have been developed: the production target mine plan, which underpins the DFS and financial valuation for the project, and the ore reserve mine plan, which supports the ore reserve estimate.

Project economics are based on the production target mine plan, which is underpinned by the Wolverine mineral ore reserves and resources estimates, and the Browns Range pilot plant stockpiles.

The production plan forecasts production of about 17 500 t/y of xenotime concentrate at an estimated 25% total rare-earth oxides (TREO), containing about 4 350 t/y of TREO.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The DFS delivers a pretax net present value, at an 8% discount rate, of A$187-million and an internal rate of return of 12%, with a seven-year payback.

Capital Expenditure
Preproduction capital is estimated at A$592-million, including A$77.5-million in contingency.

Planned Start/End Date
Not stated.

Latest Developments
Front-end engineering and design activities have started, supporting progress towards project delivery and development readiness.

Key Contracts, Suppliers and Consultants
MACA (bulk earthworks); Primero (turnkey solutions provider); Sinosteel MECC (engineering, procurement and construction contract); and K-Technologies (scoping study).

Contact Details for Project Information
Northern Minerals, tel +61 8 9481 2344, fax +61 8 9481 5929 or email info@northernminerals.com.au.


 

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Comments

Projects

Showroom

Sulzer Pumps (SA) (Pty) Ltd
Sulzer Pumps (SA) (Pty) Ltd

Sulzer South Africa, established in 1922, partners with critical industries like power, oil & gas, water, mining, and chemicals to boost...

VISIT SHOWROOM 
Weir
Weir

Weir is a global leader in mining technology. We recognise that our planet’s future depends on the transition to renewable energy, and that...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.328 0.41s - 126pq - 2rq
Subscribe Now