https://newsletter.mw.creamermedia.com
Botswana|Copper|Exploration|PROJECT|Projects|Testing|Drilling
Botswana|Copper|Exploration|PROJECT|Projects|Testing|Drilling
botswana|copper|exploration|project|projects|testing|drilling

Cobre and BHP begin drilling at Botswana copper venture

1st April 2025

By: Creamer Media Reporter

     

Font size: - +

Australian junior Cobre has commenced a diamond drilling programme at the Kitlanya West project in Botswana, targeting copper/silver mineralisation in collaboration with diversified major BHP. 

The drilling follows active seismic surveys completed in 2024 and forms part of the recently announced earn-in joint venture agreement with BHP.

The programme includes three deep drill holes exceeding 1 km, designed to test large anticlinal trap-sites identified in seismic sections and provide insights into the deeper basin architecture.

“We’re pleased to get this exciting programme under way so quickly. In addition to testing for copper/silver mineralisation in compelling trap-sites, drill results will answer a variety of key questions assessing the potential for the northern KCB margin to host large Tier 1 deposits. Results from this important phase of work will be used to further refine our seismic driven targeting strategy,” said Cobre CEO Adam Wooldridge.

This initial phase is part of a broader A$11-million exploration budget for 2025/26, which includes additional seismic surveys and further deep test holes to assess the potential of Cobre’s Kitlanya projects to host large-scale copper/silver deposits.

 

Edited by Creamer Media Reporter

Comments

Showroom

WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 
Avlock International
Avlock International

Avlock International is a leading manufacturer and distributor of Specialized Fastening Systems.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 28 March 2025
Magazine round up | 28 March 2025
28th March 2025

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.096 0.173s - 128pq - 2rq
Subscribe Now