Company faces import/export challenges
Mine ventilation and cooling specialists BBE Group tells Mining Weekly that the biggest challenge it currently faces in delivering projects is the global supply chain and logistics.
“Delays on the import front result, in turn, in delays on the fabrication and manufacturing fronts. Especially our electrical components and equipment which are usually imported from North America or Europe, and travel delays compound the stretched lead times,” says BBE Projects MD Andrew Branch.
There are also challenges regarding the import of mechanical equipment and piping materials, owing to either unexpected price increases or a shortage in supply.
In providing mining ventilation and refrigeration-related services and products across Africa, the company also has to deal with the shortage of skills and changing dynamics within different companies and contractors; a “disconnect” that Branch says he has noticed with employees working remotely.
Consequently, the company has implemented mitigation strategies to aid work processes.
“We prefer to give a complete turnkey solution in order to keep better control of the scope of work within our battery limits, and we strive to complete the in-house design and procurement phases as quickly as possible to give our suppliers and contractors the best chance to deliver on time.”
Branch adds that managing expectations of clients is a way of maintaining BBE’s high reputational standards.
Meanwhile, the company has sought to design and develop more prefabricated modular components to ensure ease of assembly in remote areas while maintaining the level of effectiveness of each component once transport and installation has been completed.
BBE Projects is currently involved in projects in Mali and Ghana, where it is supplying air cooling refrigeration plants, and in the Democratic Republic of Congo, where it is supplying fan stations.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation