Doropo gold project, Côte d'Ivoire – update
Photo by Centamin
Name of the Project
Doropo gold project.
Location
Côte d'Ivoire, between the Comoè National Park and the international border with Burkina Faso.
Project Owner/s
Centamin.
Project Description
Results from the prefeasibility study (PFS) have demonstrated an economically robust project.
The project comprises 1 847 km2 and covers 13 gold deposits – Souwa, Nokpa, Chegue Main, Chegue South, Tchouahinin, Kekeda, Han, Enioda, Hinda, Nare, Kilosegui, Attire and Vako, with total mineral reserves of 40.55-million tonnes grading 1.44 g/t gold. Measured and indicated resources are estimated at 51.51-million tonnes grading 1.52 g/t gold and inferred resources at 13.67-million tonnes grading 1.14 g/t gold. The mine plan proposes the conventional openpit mining of a sequence of shallow pits.
Mineral processing will be undertaken through a 4-million-tonne- to 5.5-million-tonne-a-year semiautogenous grinding mill, ball mill and crusher circuit, and conventional carbon-in-leach circuit for an average life-of-mine gold recovery of 92%.
The PFS envisages average gold production of 173 000 oz/y over the ten-year life-of-mine, with an average of 210 000 oz in the first five years.
Potential Job Creation
None stated.
Net Present Value/Internal Rate of Return
The project has an after-tax net present value, at a 5% discount rate, of $330-million and an internal rate of return of 26%, with a payback of 2.3 years.
Capital Expenditure
$349-million, inclusive of a 10% contingency.
Planned Start/End Date
Not stated.
Latest Developments
Centamin is aiming to complete the definitive feasibility study by midyear.
Key Contracts, Suppliers and Consultants
None stated.
Contact Details for Project Information
Centamin, tel +44 1534 828700 or email info@centamin.com.
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation