Havieron underground gold/copper project, Australia

Location map of the Havieron project

Photo by Greatland Resources

20th February 2026

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Havieron underground gold/copper project.

Location
Paterson province, in the East Pilbara region of Western Australia.

Project Owner/s
Dual-listed Greatland Resources.

Project Description
Havieron is a world-class, brownfield, high-grade underground gold/copper deposit, with considerable mine development already completed.

Gold and copper production are estimated at 266 000 oz/y and 96 000 t/y respectively over an initial 17-year life-of-mine. This includes nine-years at steady state.

Total production is estimated at 3.53-million ounces of gold and 130 000 t of copper.

Havieron will employ a sublevel open stoping mining method with paste back fill of primary stopes to allow for mining of secondary stopes, to maximise mining inventory and production rate, and to minimise operating and capital costs.

The mine design comprises 12 independent mining sequences – six panels, separated into east and west – based on horizontal and vertical mining fronts. Ore will be hauled by truck to Greatland’s Telfer operations and processed through the 20-million-tonne-a-year Telfer mill, taking advantage of the existing infrastructure and similar flowsheet requirements of the two ores, minimising capital expenditure (capex).

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 5% discount rate, of $4.24-billion and an after tax internal rate of return of 22.5%

Capital Expenditure
Preproduction capex is estimated at $1.07-billion, with expansion capex estimated at A$673-million (largely self-funded).

Planned Start/End Date
The development schedule for the completion of Havieron’s development depends on receipt of primary environmental permits, with the receipt of primary environmental permits targeted for the 2026 financial year.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Greatland Resources, email info@greatland.com.au.
 

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Projects

Image of graphite from Orom-Cross project
Orom-Cross graphite project, Uganda
Updated 1 hour 47 minutes ago By: Sheila Barradas

Showroom

Hanna Instruments (Pty) Ltd
Hanna Instruments (Pty) Ltd

We supply customers with practical affordable solutions for their testing needs. Our products include benchtop, portable, in-line process control...

VISIT SHOWROOM 
ZF Aftermarket
ZF Aftermarket

ZF Aftermarket is the after-sales division of the world-renowned German ZF group, a global leader in mobility technology.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Resources Watch
Resources Watch
18th February 2026

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.136 0.216s - 127pq - 2rq
Subscribe Now