Jubilee executes transaction on Large Waste Project
Aim-listed Jubilee Metals has secured the exclusive rights to the Large Waste Project, in Zambia, for a reduced consideration of $18-million – previously $30-million.
The company has until mid-May to elect to acquire the assets and settle about $11.5-million remaining of the consideration over a period of 12 months.
Jubilee says it has been performing a due diligence on the project which included sampling campaigns, laboratory testwork and pilot-scale trials, the results of which will inform the board’s decision as to whether to exercise the option to acquire the assets.
On the back of encouraging results from the due diligence completed so far, Jubilee says it has entered into an agreement to sell ten-million tonnes of the estimated 260-million tonnes of material to a selected multinational metals company.
The value of the ten-million-tonne material trade is estimated at $6.75-million.
Under the terms of the agreement, Jubilee will gain a detailed insight into the performance of the material when processed at the partnered company’s existing facilities, the results of which will provide a high degree of confidence in the expected performance of the material if processed in future by Jubilee.
Jubilee CEO Leon Coetzer says the company’s copper strategy continues to gain further momentum on the back of the restart of its Roan Concentrator processing high-grade copper material, as well as the expansion of its Munkoyo mining operation.
He notes that the Large Waste Project offers tremendous potential for Jubilee to significantly expand its copper portfolio in Zambia.
“We have been considering carefully the optimal partner for the implementation of the project especially following the encouraging results of the due diligence review. Jubilee has held extensive engagements with numerous interested parties on the best way to monetise the project,” says Coetzer.
He adds that the project has attracted keen interest from both metal offtake backed funding as well as large multinational copper-producing entities interested to partner on the potential project.
“The trade of this small quantity of material compared with the size of the asset – less than 5% of the estimated contained material – not only demonstrates the potential value of the asset but also offers Jubilee the opportunity to confirm the technical performance of the material through a large-scale trial.”
Comments
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation