Kangankunde rare earths project, Malawi

Image of Elevated view of the recovery circuit and tailings thickener

Elevated view of the recovery circuit and tailings thickener

Photo by Lindian Resources

30th August 2024

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Kangankunde rare earths project.

Location
About 90 km north of Blantyre and 13 km south of Balaka, in Malawi.

Project Owner/s
Lindian Resources.

Project Description
A feasibility study on the Stage 1 development of the project has confirmed a technically low-risk and economically robust project, with maiden ore reserves of 23.7-million tonnes at 2.9% total rare-earth oxides (TREOs) supporting a Stage 1 life-of-mine of 45 years. 

Stage 1 envisages average production of about 15 300 t/y of premium concentrate with 55% TREO grade, with low levels of radionuclides (thorium and uranium) and limited acid-consuming minerals. 

The premium concentrate will contain an estimated 8 400 t/y of rare-earth oxide (REO) and about 1 640 t/y of neodymium/ 
praseodymium. 

The unique mineralogy of the Kangankunde’s ore makes it amenable to relatively high levels of REO recovery, mainly through a physical process of gravity and magnetic separation. 

As a result, the project’s flowsheet only requires a small flotation circuit at the back end of the plant to reduce impurities such as sulphides.

The very strong economics of Stage 1 and the large resource endowment of the project, together with robust market demand forecasts, provide confidence for a potential Stage 2 expansion to significantly increase yearly production. 

Lindian intends to formally start a Stage 2 expansion study in 2024.

Potential Job Creation
The project will require more than 200 full-time equivalent site roles during the construction phase, and more than 100 full-time equivalent site roles during the operational phase.

Net Present Value/Internal Rate of Return
Stage 1 has an after-tax net present value, at a (real) 8% discount rate, of $555-million and an internal rate of return of 80%, with a payback of 1.5 years.

Capital Expenditure
Preproduction capital is estimated at $40-million, which includes 12.5% contingency, making it one of the lowest capital cost rare earths projects under development.

Planned Start/End Date
The development schedule is aiming to achieve funding confirmation in the third quarter of 2024, the start of site construction in the fourth quarter of 2024 and commissioning of the processing plant in the fourth quarter of 2025.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Lindian Resources, tel +61 8 6557 8838 or email info@lindianresources.com.au.
 

Edited by Martin Zhuwakinyu
Creamer Media Senior Deputy Editor

Comments

Showroom

The Southern African Institute of Mining and Metallurgy
The Southern African Institute of Mining and Metallurgy

The SAIMM started as a learned society in 1894 after the invention of the cyanide process that saved the South African gold mining industry of the...

VISIT SHOWROOM 
Actom image
Actom

Your one-stop global energy-solution partner

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Photo of Martin Creamer
On-The-Air (15/11/2024)
15th November 2024 By: Martin Creamer
Magazine round up | 15 November 2024
Magazine round up | 15 November 2024
15th November 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.053 0.187s - 128pq - 3rq
Subscribe Now